Original source · versioned page text
1909-13367 SRA RA6-N Response with conditions
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
1909-13367 SRA Attachment 3—Reasons for referral agency response (Given under section 56(7) of the Planning Act 2016) The reasons for the department’s decision are: The proposal does not create a safety hazard for users of a state-controlled road if conditioned to ensure the development occurs in accordance with the site plan and stormwater management reports and road access works are constructed in accordance with Department of Transport and Main Roads standards. The proposal does not compromise the structural integrity of state-controlled roads, road transport infrastructure or road works if conditioned to ensure the impacts of filling and excavation works and stormwater events are minimised and managed. The proposal does not result in a worsening of the physical condition or operating performance of state-controlled roads and the surrounding road network if conditioned to ensure the impacts of filling and excavation works and stormwater events are minimised and managed and site access occurs in accordance with the site plan and Department of Transport and Main Roads standards. The proposal does not compromise the state’s ability to construct, or significantly increase the cost to construct state-controlled roads and future state-controlled roads. The proposal does not compromise the state’s ability to maintain and operate state-controlled roads, or significantly increase the cost to maintain and operate state-controlled roads. The proposal does not create a safety hazard for users of a railway; does not compromise the structural integrity of railways; does not result in a worsening of the physical condition or operating performance of railways; does not compromise the state’s ability to construct, or significantly increase the cost to construct railways; and does not compromise the state’s ability to maintain and operate railways, or significantly increase the cost to maintain and operate railways if conditioned to ensure the development footprint and filling and excavation works occurs in accordance with the site plans and stormwater events are minimised and managed. The proposal maintains the operational performance of the transport network and provides public passenger transport infrastructure to enable development to be serviced by public passenger transport and provides safe and direct access to public passenger transport infrastructure, including access by cycling and walking. With conditions, the proposal complies with the purpose and outcomes of State code 1: Development in a state-controlled road environment, State code 2: Development in a railway environment and State code 6: Protection of state transport networks of the State Development Assessment Provisions. Material used in the assessment of the application: The development application material and submitted plans. Planning Act 2016. Planning Regulation 2017. The State Development Assessment Provisions (version 2.5), as published by the department. The Development Assessment Rules. Department of State Development, Manufacturing, Infrastructure and Planning Page 13 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original