1909-13367 SRA RA6-N Response with conditions
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
1909-13367 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application). (Copies of the plans and specifications referenced below are found at
Attachment 5).
No. Conditions Condition timing
Development permit for a material change of use for Multiple housing – Type 5 (seniors
living community of 232 independent living units) and Entertainment and dining business –
Type 2 (Cooroy Golf Club house)
Schedule 10, part 9, division 4, subdivision 1, table 1, item 1 of the Planning Regulation 2017—
State transport infrastructure and schedule 10, part 9, division 4, subdivision 2, table 4, item 1 of
the Planning Regulation 2017—State-transport corridor —The chief executive administering the
Planning Act 2016 nominates the Director-General of the Department of Transport and Main Roads
to be the enforcement authority for the development to which this development approval relates for
the administration and enforcement of any matter relating to the following conditions:
Railway corridor
1. The setback of the development from the railway corridor must be Prior to the
carried out generally in accordance with the following plans: commencement of
Site Context Study, prepared by Jared Poole Design, use and to be
dated 1 August 2019, drawing number DP1074/SK4.01, maintained at all
revision A; and times
Preliminary Earthworks Plan, prepared by Westera
Partners, dated 16 August 2019, S19/007 P, revision A.
Stormwater and drainage
2. (a) The development must be carried out generally in accordance (a) At all times
with the following:
Sections 3.1.2, 3.1.10, 4 and 5 of the Flood Study,
(b) Prior to the
prepared by Westera Partners, dated 11 December 2019,
commencement of
reference S19-007, revision 1; and
use
Sections 2.2 – 2.3, 3.4 – 3.6 and 6.3 Appendix AC –
Engineering Drawings of the Stormwater Management
Report, prepared by Westera Partners, dated 18
December 2019, reference S19-007, revision 1.
(b) RPEQ certification with supporting documentation must be
provided to North Coast District
([email protected]) within the Department of
Transport and Main Roads, confirming that the development
has been constructed in accordance with part (a) of this
condition.
Pedestrian access to public passenger transport
3. (a) Pedestrian crossing works across Myall Street and paved (a) & (b) Prior to the
pedestrian footpaths to each bus stop must be provided commencement of
generally in accordance with the Functional Layout – Left & use for Stage 1
Right Turn Treatment, prepared by TTM Consulting Pty Ltd,
dated 28 November 2019, drawing number 19BRT0357-05,
revision A.
(b) The pedestrian footpath must be designed and constructed in
accordance with the Department of Transport and Main
Roads' Road Planning and Design Manual and Road Safety
Department of State Development, Manufacturing, Infrastructure and Planning Page 4 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original