1909-13367 SRA RA6-N Response with conditions
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
1909-13367 SRA
No. Conditions Condition timing
Policy.
4. The internal pedestrian network (verges) and pedestrian pathway Prior to the
connection to Myall Street must be provided generally in commencement of
accordance with the Master Plan, prepared by Jared Poole use for the relevant
Design, dated 3 December 2019, drawing number stage, and to be
BP1074/SK2.01, issue R; as amended in red. maintained at all
times
Public passenger transport
5. (a) The applicant must provide a pair of bus stops on Myall (a) - (c) Prior to the
Street at the locations shown on the Functional Layout – commencement of
Left & Right Turn Treatment, prepared by TTM Consulting use for Stage 1
Pty Ltd, dated 28 November 2019, drawing number
19BRT0357-05, revision A.
(b) Each bus stop must be in accordance with the Disability
Standards for Accessible Public Transport 2002 made
under subsection 31(1) of the Disability Discrimination Act
1992 and include the following components in accordance
with the Department of Transport and Main Roads’
TransLink Public Transport Infrastructure Manual 2015:
(i) all mandatory bus stop components for an
‘Intermediate Stop’ detailed in Section 5.7 - ‘Bus
stop components’ (pages 30-41) of Chapter 5 -
‘Bus stop infrastructure’;
(ii) a J-pole sign with timetable case in accordance
with Figure 5.11 – ‘Bus stop identification markers’
(page 50) and Table 5.9 - ‘Stop signage/stop
marker’ (page 35) of Chapter 5 - ‘Bus stop
infrastructure’, and Sign Type IS-10b ‘Bus Stop – J
Pole Sign (TransLink)’ (sections 4.26.1 – 4.27,
page 63-65) of the Signage Manual – Bus Network
Infrastructure, TransLink Division, Department of
Transport and Main Roads, December 2016;
(iii) a disability compliant shelter and seat must be
provided in accordance with Noosa Council
requirements and Table 5.9 – ‘TransLink
requirements for bus stop components – bus stop
furniture – shelters and seating’ (page 38) of
Chapter 5 – ‘Bus Stop Infrastructure’;
(iv) an indented bus zone to accommodate the set
down of a single unit rigid bus of 12.5m in length in
accordance with Section 5.6.3.1 – ‘Bus stop length
requirements’, ‘Table 5.7: Minimum bus stop
length requirements’ (pages 28-29) of Chapter 5 –
‘Bus stop infrastructure’ and Table 5-4: ‘Bus stop
arrangements’ (bus bay width a minimum of 3m
excluding cycle lanes and tapers for the speed
environment) of Chapter 5 – ‘Bus stop
infrastructure’; and
(v) hardstand and access in accordance with DRG5 –
0022 – ‘Intermediate Stop – Site Layout – With
Indented Bus Bay’.
(c) RPEQ certification must be provided to the North Coast
Department of State Development, Manufacturing, Infrastructure and Planning Page 5 of 15