Original source · versioned page text
1909-13367 SRA RA6-N Response with conditions
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
1909-13367 SRA
No. Conditions Condition timing
development has been designed in accordance with parts (a)
and (b) of this condition.
Filling and excavation
12. (a) Any excavation, filling/backfilling/compaction, retaining (a) At all times
structures, stormwater management measures, services,
batters and other works involving ground disturbance must not
encroach or de-stabilise the state-controlled road. (b) Prior to the
commencement of
use
(b) RPEQ certification with supporting documentation must be
provided to North Coast District at
([email protected]) within the Department of
Transport and Main Roads', confirming that the development
has been constructed in accordance with part (a) of this
condition.
Development permit for reconfiguring a lot (boundary realignment and access easement)
Schedule 10, part 9, division 4, subdivision 2, table 1, item 1 of the Planning Regulation 2017—
State transport corridor—The chief executive administering the Planning Act 2016 nominates the
Director-General of the Department of Transport and Main Roads to be the enforcement authority
for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:
13. (a) The road access locations are to be located generally in (a) At all times
accordance with Proposed Reconfiguration Lots 1, 2 & 3
SP1159864, prepared by DSQ Land Surveyors, dated 7
August 2019, reference 13422-PRO-01, revision C. (b) – (c) Prior to
submitting the Plan of
Survey to the local
(b) Road access works comprising the Main Access must be
provided generally in accordance with: government for
approval and to be
(i) Institute of Public Works Engineering Australasia
(IPWEA) Standard Drawing RS-051 Rev H, General maintained at all
Wide Flared, Driveways Heavy Duty Vehicle times
Crossing; and
(ii) Channelised Right Turn and Auxiliary Left Turn
Treatment (CHR and AUL) turn treatments from Myall
St into Lot 2 on SP115864;
at the road access location.
(c) The road access works must be designed and constructed in
accordance with the Department of Transport and Main
Roads' Road Planning and Design Manual.
14. (a) Any redundant existing vehicular property access located (a) & (b) Prior to
between the proposed development and Myall Street/Cooroy submitting the Plan of
Connection Road must be permanently closed and removed. Survey to the local
government for
(b) The verge, including, but not limited to, local government approval
footpath, between the pavement edge and the property
boundary, must be reinstated in accordance with the
Department of Transport and Main Roads' Road Planning and
Design Manual, standard drawings and specifications at no
cost to the Department of Transport and Main Roads.
Department of State Development, Manufacturing, Infrastructure and Planning Page 8 of 15