1.0 Approval History and Relevant Period
Development Permits for Building Works were issued on 06/0807 and 24/1008. A copy of these approvals is
attached for Council’s reference. These Building Works approvals are ((related approvals" under s341 of SPA as
they were lodged within 2 years of the last related approval (refer to table below).
Approval Date Approval Details Notes
15 December 2005 Negotiated Decision (2004/5744) Council agreed to amend conditions.
18 Aug 2006 Operational Works Landscaping
-
"related approval"
14 December 2006 Operational Works- Civil "related approval"
6 August 2007 Development Permit -
Building Works (Stage 1 Building works application lodged
comprising 38 independent living units, gym and within 2 years of the earlier approval
community centre -
Ref: 20071609). taking effect ("related approval")
24 October 2008 Development Permit for Building Works (Stage 1 shed,
-
Building works application was lodged
gazebo and swimming pool Ref: 20087920)
-
within 2 years of the last related
approval ("related approval")
,,11t:""~:
,.-:,.:.,:"! 8 September 2009 Change to Existing Approval (2004/5744) Conditions amended, including deletion
of "sunset clause" condition.
r;"1
_0-:";
,.’, i The related building approvals have rolled forward the MCU approval by four years from the date of the last
~~?:,l
related building approval. That is, the MCU approval is rolled forward four years from 24/10/08, being the last
’’’’_’’:!
--""1< ’1 related approval, until 24/10/12.
~~ ~j~
2.0 Details of Proposed Changes
-J:jl ~,
~\JI.I
~;J To ensure the MCU approval remains valid for the duration of the construction program, we request Council
includes a condition specifying the relevant period for each stage. That is, the use of each stage listed below must
ml have commenced by the following dates:
t~ll Stage Description Relevant Period
i~....t
1 38 independent living units, gym & community centre Completed
2 12 independent living units 24 October 2014
3 19 independent living units 24 October 2016
4 39 serviced apartments & 28 condo apartments 24 October 2018
~. 5
6
18 independent living units
15 independent living units
24 October 2020
24 October 2022
~ The proposed relevant periods will reflect a construction timeframe that is broadly consistent with the relevant
s periods that could be achieved using the roll forward provisions under SPA, and will allow our client increased
flexibility to deliver one or more subsequent stages to suit market conditions.
There are no other changes to conditions of approval required, other than to include the Proposed Stage Plan
I drawing no. CCV-SK-001 dated 24/04/12 as an approved drawing.
~
!
.
~~. ,
J!~
L,
;~:~ ~
I’ ;"’1
JFP Ref: M17l7 Page 2
l’~
kh
j
~ (I.,
[OCR of page images]
EAtUBSE
=a
RENMEI
URBANCONSULTANTS
errr ere
Development Permits for Building Works were issued on 06/0807 and 24/1008. A copy of these approvals is
attached for Council’s reference. These Building Works approvals are “related approvals” under s341 of SPA as
they were lodged within 2 years of the last related approval (refer to table below).
Nye eee Approval Details elec
15 December 2005 Negotiated Decision (2004 /5744) Council agreed to amend conditions.
18 Aug 2006 Operational Works - Landscaping “related approval”
14 December 2006 Operational Works- Civil “related approval”
6 August 2007 Development Permit - Building Works (Stage 1 Building works application lodged
comprising 38 independent living units, gym and within 2 years of the earlier approval
community centre — Ref: 20071609). taking effect (“related approval”)
24 October 2008 Development Permit for Building Works — (Stage 1 shed, | Building works application was lodged
gazebo and swimming pool - Ref: 20087920) within 2 years of the last related
approval (“related approval”)
8 September 2009 Change to Existing Approval (2004/5744) Conditions amended, including deletion
of “sunset clause” condition.
The related building approvals have rolled forward the MCU approval by four years from the date of the last
related building approval. That is, the MCU approval is rolled forward four years from 24/10/08, being the last
related approval, until 24/10/12.
To ensure the MCU approval remains valid for the duration of the construction program, we request Council
includes a condition specifying the relevant period for each stage. That is, the use of each stage listed below must
have commenced by the following dates:
38 independent living units, & community centre Completed
12 independent living units 24 October 2014
19 independent living units 24 October 2016
39 serviced apartments & 28 condo apartments 24 October 2018
18 independent living units 24 October 2020
15 independent living units 24 October 2022
The proposed relevant periods will reflect a construction timeframe that is broadly consistent with the relevant
periods that could be achieved using the roll forward provisions under SPA, and will allow our client increased
flexibility to deliver one or more subsequent stages to suit market conditions.
There are no other changes to conditions of approval required, other than to include the Proposed Stage Plan
drawing no. CCV-SK-001 dated 24/04/12 as an approved drawing.
JFP Ref: M1717 Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Change an Application 132004.5744.03Related documentApplication case desk ↗
About this file
- File size
- 11.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.