Original source · versioned page text
2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 30, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Division 6 Residential Uses Code Table 14-24 — For All Residential Uses 14.46 Effects of Use Column 1 Specific Outcomes column 2 Probable solutions (if code assessable) Electricity supply infrastructure O1 The development does not adversely impact on existing or future electricity supply infrastructure; AND O2 All uses and works maintain an adequate safe distance from electrical infrastructure including substations, overhead powerlines, power poles and transformers. $1.1 No solution provided $2.1 Development for uses adjacent to or within 50m of an existing electricity substation incorporates noise attenuation measures to mitigate noise impacts; AND $2.2 Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not constructed under overhead electricity transmission lines, or within electricity easements; AND $2.3 A minimum separation distance is maintained from the electricity transmission line to the closest boundary of habitable buildings and child activity areas, as follows— a) 20m for transmission lines up to 132kV; b) 30m for transmission lines between 133kV and 275kV; and c) 40m for transmission lines greater than 275kV. The proposed development is not within the prescribed limits of any existing electricity substation or electrical transmission lines. Electrical supply and communications can be provided to the proposed lots. Water supply and conservation O3 On-site water storage is designed and operated to support the efficient use of water; AND O04 On-site water storage is adequate $3.1 & $4.1 For a Class 1 building*® other than a Detached house , outside a reticulated water service area, a rainwater tank is to be installed with the following minimum storage The development it exclusively for detached housing and is within a reticulated water service area. 1|Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.