2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 32, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Column 1 Specific Outcomes column 2 Probable solutions (if code assessable) 04 Filling or excavation does not adversely affect sewer, stormwater or water utility infrastructure. impose any additional surcharge loading on the service. $4.2 Where excavation is carried out a) a minimum cover of 600mm is maintained around all utility infrastructure (to top, sides and base of services); or b) a retaining wall is provided to support the soil surrounding the service; AND $4.3 Compaction with a vibrating roller is not carried out within 600mm of any utility infrastructure. and generally not within 600mm of any utility infrastructure. All new services within the site will have a minimum of 600mm cover or as required by the approving authority. Services and Utilities O6 The house is provided with infrastructure, services and utilities appropriate to its setting. $6.1 Where located in an urban zone, or a water or sewerage service area, appropriate connection is provided to reticulated sewerage, water supply and stormwater drainage. Appropriate connection to reticulated sewerage, water supply, electricity and communications is planned subject to agreement and approval by Unity Water, the electricity and the communications authorities Water Supply Infrastructure O8 Existing water supply infrastructure, including pipeline corridor, is protected from incompatible development to ensure the safety and reliability of water supply network. $8.1 Buildings and structures are setback a minimum of 20m from a water supply pipeline as shown on Overlay Map OM3.5. The proposed development is not within the area of the Cooroy & Lake Macdonald Natural Resources Overlay (Map OM3.5). Water conservation and storage 020 On-site water storage is provided, designed and operated to support the efficient use of water and is $20.1 If not in a water service area each Detached house is to be serviced with a rainwater tank of the following minimum storage capacity:- The proposed development is ina reticulated water service area. 3|Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.