2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17

Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 35, section 1. The text section number identifies this passage in the reader.

Castaways — 2 David Low Way, Castaways Beach
Civil Works, including drainage, earthworks, erosion and sediment
control, waste management and services

 

Column 1 Specific
Outcomes

column 2 Probable
solutions (if code
assessable)

 

kg/m3) or 10mm thick
compressed granulated
corkboard installed to
manufacturer’s
specifications; and

d) the slab is not less than
100mm thick; and e) surface
is broom finished or
exposed aggregate;

AND

$5.3 For asphalt surfaces,
the following applies—

a) at least 100mm thick
compacted roadbase under
asphalt cover; and

b) asphalt cover is not less
than 25mm thick;

AND

$5.4 For clay or concrete
pavers the following
applies— a) paving units are
not less than 40 mm thick;
and

b) at least 100mm thick
compacted sub-base under
the pavers.

 

Protection of infrastructure
O9 Driveways do not
damage or interfere with
the location, function of, or
access to Council or other
infrastructure

 

 

$9.1 Driveways maintain a
minimum of 600mm cover
over all infrastructure;

OR

$9.2 Driveways include a
minimum cover to
infrastructure of 100mm
thick concrete reinforced to
the standard required at
$5.3;

AND

$9.3 Driveways are located
not less than 1.5m from
infrastructure service points
including sewerage access
points, stormwater pits,

 

The driveway will be
designed to meet cover
requirements in the Code.
The location of the driveway
will seek to be located at
the appropriate offsets from
service points required by
the code.

 

6|Page

2/06/2017

 
Log in to download the original file

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17.pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.