Original source · versioned page text
2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 37, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Column 1 Specific Outcomes column 2 Probable solutions (if code assessable) $2.2 Driveways are designed and constructed in accordance with Council Standard Drawing requirements , as appropriate for the particular type of development as annotated on the drawings; AND $2.3 The change in grades in the driveways and ramps is in accordance with Council’s Standard Drawing requirements. O8 The layout of the development provides adequate, clearly defined and easily accessible— a) on-site vehicle parking and manoeuvring areas; and b) loading and manoeuvring areas for delivery and service vehicles. $8.1 Parking bays, manoeuvring areas, queuing areas, loading, setdown and pickup areas and driveways are designed to the standards set out in the Australian Standards for Off-street Carparking and Off-street Commercial Vehicles Parking. AND $8.2 The number of loading bays is not less than the minimum number specified in Table 14-51. Parking bays, loading, setdown and pickup areas are proposed within the private property boundary at the rate of % bay / lot. Parking will be provided at each individual property as approved by Council. Manoeuvring will be accommodated at the entrance to the access road to enable service vehicles to turn and to exit the property in a forward direction. Division 14 — Earthworks Code Table 14-52 - Earthworks 14,119 Effects of Works Drainage O1 Finished surface levels ensure land is free draining. $1.1 The finished surface gradient of any filled or excavated area is within the range 0.5% to 1.5% and drains to Council’s stormwater infrastructure where available or where stormwater infrastructure is The finished surface gradient of any filled or excavated area will be designed within the range 0.5% (1:200) to 1.5% (1:66). No suitable Council stormwater infrastructure is available adjacent to the 8| Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.