Original source · versioned page text
2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Column 1 Specific column 2 Probable O2 Any change to the level of the land does not have an adverse flooding impact on the flooding and drainage characteristics off-site. Outcomes solutions (if code assessable) not available, toward the site. Stormwater runoff will street. be collected within the site and a stormwater outfall provided as required to connect to Council’s existing stormwater infrastructure. Hydraulics No solution provided. The development site is not within a flood prone area. Runoff from changes to the land levels will be captured on site before discharge to an appropriate legal point of discharge agreed with Council Geotechnical considerations 03 Earthworks do not result in geotechnical instability on the premises or nearby premises. For assessable development— $3.1 Filling works are undertaken in accordance with Section 2.8- Filling of Site of Council’s PSP5 - Engineering Design Standards- Roads and Drainage & Earthworks AND $3.2 Where the filling is for residential commercial or industrial purposes the works comply with Australian Standard - Guidelines for earthworks on commercial & residential development. Earthworks will be undertaken in accordance with Section 2.8- Filling of Site of Council’s PSP5 - Engineering Design Standards- Roads and Drainage & Earthworks and comply with Australian Standard - Guidelines for earthworks on commercial & residential development. Fill will be placed using level one Earthworks Control Local amenity 04 Earthworks do not cause disturbance to the amenity of the neighbouring land. S4.1 The following control measures are implemented— a) regular water spraying of exposed areas to suppress dust; b) provision of dust stabilised or sealed internal roads; c) protective covering of exposed areas that are left for more than 2 weeks; and The documentation prepared for the construction phase will include appropriate control measures required including: a) Suppressing dust b) Sealing internal driveways c) Protecting exposed areas 9|Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.