Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17

Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 45, section 1. The text section number identifies this passage in the reader.

Castaways — 2 David Low Way, Castaways Beach
Civil Works, including drainage, earthworks, erosion and sediment
control, waste management and services

 

Column 1 Specific
Outcomes

column 2 Probable
solutions (if code
assessable)

 

including from run-off and
erosion.

 

b) Queensland Design Code
for Residential Streets;

c) AUSTROADS; or

d) A combination of the
principles in these
documents; AND

$9.2 Erosion and sediment
control measures are
designed and implemented
in accordance with the
Institution of Engineers
Australia (Queensland
Division) Soil Erosion and
Sediment Control -
Guidelines for Queensland
Construction Sites.

 

contradictions are found,
reference shall be made to
Council for confirmation of
hierarchy between
documents.

For the construction phase,
erosion and sediment
control measures shall be
designed and implemented
in accordance with the
Institution of Engineers
Australia (Queensland
Division) Soil Erosion and
Sediment Control -
Guidelines for Queensland
Construction Sites.

 

 

Division 19—Waste Management Code

 

Table 14-60

 

Waste separation

O1 Development that
generates several classes of
waste is designed so waste
is collected, stored and
disposed of in a safe and
ecologically sustainable
manner** .

O2 Waste storage areas
provide for adequate
separation of all recyclable
and non-recyclable
materials.

 

 

$1.1 Construction,
operational and demolition
works are planned and
managed in accordance
PSP1135;

AND

$1.2 Adequate area is
provided for on-site for the
collection and separate
storage of recyclable, non-
recyclable, vegetative and
hazardous materials in their
specific waste streams
during construction,
operational and demolition
works; AND $2.1 Waste
storage areas allow for the
separate storage of
different waste materials
for

reuse or recycling by—

 

Construction, operational
and demolition works shall
be planned and managed in
accordance PSP1135

The Principal Contractor
shall be required to provide
adequate areas on-site for
the collection and separate
storage of recyclable, non-
recyclable, vegetative and
hazardous materials in their
specific waste streams
during construction,
operational and demolition
works. This shall be
documented in the Principal
Contractor’s waste
management plan.

 

16|Page

2/06/2017

 
Log in to download the original file

2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17.pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.