Original source · versioned page text
2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 45, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Column 1 Specific Outcomes column 2 Probable solutions (if code assessable) including from run-off and erosion. b) Queensland Design Code for Residential Streets; c) AUSTROADS; or d) A combination of the principles in these documents; AND $9.2 Erosion and sediment control measures are designed and implemented in accordance with the Institution of Engineers Australia (Queensland Division) Soil Erosion and Sediment Control - Guidelines for Queensland Construction Sites. contradictions are found, reference shall be made to Council for confirmation of hierarchy between documents. For the construction phase, erosion and sediment control measures shall be designed and implemented in accordance with the Institution of Engineers Australia (Queensland Division) Soil Erosion and Sediment Control - Guidelines for Queensland Construction Sites. Division 19—Waste Management Code Table 14-60 Waste separation O1 Development that generates several classes of waste is designed so waste is collected, stored and disposed of in a safe and ecologically sustainable manner** . O2 Waste storage areas provide for adequate separation of all recyclable and non-recyclable materials. $1.1 Construction, operational and demolition works are planned and managed in accordance PSP1135; AND $1.2 Adequate area is provided for on-site for the collection and separate storage of recyclable, non- recyclable, vegetative and hazardous materials in their specific waste streams during construction, operational and demolition works; AND $2.1 Waste storage areas allow for the separate storage of different waste materials for reuse or recycling by— Construction, operational and demolition works shall be planned and managed in accordance PSP1135 The Principal Contractor shall be required to provide adequate areas on-site for the collection and separate storage of recyclable, non- recyclable, vegetative and hazardous materials in their specific waste streams during construction, operational and demolition works. This shall be documented in the Principal Contractor’s waste management plan. 16|Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.