Original source · versioned page text
2 David Low Way - Attachment 3 - Civil Engineering Assessment - Sheehy 10-8-17
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
Castaways — 2 David Low Way, Castaways Beach Civil Works, including drainage, earthworks, erosion and sediment control, waste management and services Column 1 Specific Outcomes column 2 Probable solutions (if code assessable) $2.2 The width of the easement is the greater of 3m or the width of the zone of influence; AND $2.3 The easement is centred over the centreline of the infrastructure. network. The sewer requirements are to be negotiated and agreed with Unity Water to meet the authority requirements. Division 18—Transport, Roads and Drainage Code Table 14-59 — Roads and drainage 14.146 Road and drainage design and construction O8 Stormwater drainage infrastructure is planned, designed and constructed to— a) be accessible, cost effective and easily maintainable; b) protect downstream capacity; c) protect downstream water quality; d) maximise on-site stormwater retention and retardation; and e) convey run-off to stormwater drainage in a manner that allows roads to be trafficable in Q100 ARI local rainfall events. $8.1 Stormwater drainage planning, design and construction is in accordance with Section 4 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks; AND $8.2 As Constructed data is submitted in accordance with Section 6 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks; AND $8.3 Stormwater drainage planning, design and construction is in accordance with the Queensland Urban Drainage Design Manual. Stormwater drainage planning, design and construction shall be in accordance with Section 4 of PSPS Engineering Design Standards — Roads, Drainage and Earthworks and the Queensland Urban Drainage Design Manual. Where contradictions are found, reference shall be made to Council for confirmation of hierarchy between documents. As Constructed data shall be submitted in accordance with Section 6 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks O9 Roads and stormwater drainage infrastructure is constructed— a) in accordance with appropriate engineering standards; and b) to minimise adverse environmental impacts, $9.1 Roads and stormwater drainage infrastructure is constructed in accordance with— a) Sections 2, 3 and 4 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks; Stormwater drainage planning, design and construction shall be in accordance with Section 2, 3 and 4 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks, Queensland Streets and Austroads. Where 15|Page 2/06/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.