Council archive · source document
Development Application part 2 of 2 , Planning report/Plans MCU12/0036
Plans and drawings: the text below has words only, no drawings.
Very large file (28.5 MB): may take a few minutes to open.
Planning Report
6 Planning Scheme
6.1 Noosa Plan
As highlighted earlier in this report, the planning scheme applicable to the proposed development is the
Noosa Plan (the ’Planning Scheme’).
6.2 Strategic Framework
The Noosa Plan outlines a Strategic Framework which reflects the desired environmental outcomes (DEOs)
and summarises the approach taken by the Planning Scheme to achieve the DEOs. In
facilitating the
achievement of the desired environmental outcomes, the Strategic Framework provides a more specific
outline of how the three strands of ecological sustainability (environmental, economic and social) are
balanced and integrated within the Livingstone Shire.
6.2.1 Desired Environmental Outcomes
The Sustainable Planning Act 2009 maintains the effect of Section 3.5.14 (2)(a)of the Integrated Planning
Act 1997, which required that the assessment manager’s decision for Impact Assessable application must
not "compromise the achievement of the desired environmental outcomes for the planning scheme area".
The Noosa Plan identifies DEOs by ’use’ rather than under general themes. Accordingly, an assessment of
the proposal against the ’Infrastructure and Services’ Desired Environmental Outcome (DEO)contained
within the Planning Scheme demonstrates that the proposal meets the intent of the DEO as follows:
L) INFRASTRUCTURE AND SERVICES
The efficient provision and use of services such as water, sewerage, power, telecommunications and
waste disposal caters for the needs of residents and visitors, relative to their location within Noosa.
Response:
The proposed development is consistent with this DEO. The proposal seeks approval for a
telecommunication facility within Cooroy. This will overcome coverage and network capacity issues
for local residents and visitors of Cooroy.
The ongoing viability of existing infrastructure services and facilities are protected from the impacts of
future development.
Response:
The proposed development is consistent with this DEO. The proposal seeks to consolidate an
existing Telstra exchange by providing a telecommunications tower on the same land. This will
prevent the need to acquire new land for the facility.
Community Implications of Infrastructure & Services
Coastal urban residents and visitors expect a certain level of infrastructure and servicing, which includes
power, telecommunications, garbage collection, running water and flush toilets.
Response:
Whilst the proposed development is not located in a coastal area, it proposes telecommunications
infrastructure to relieve and enhance the existing network in Cooroy.
Broadband telecommunications infrastructure allows people to work and study from home and access
goods and services over the Internet.
Response:
The proposed facility will particularly enhance the data capacity capabilities of mobile phones within
the Cooroy area; allowing people to efficiently access the internet on their mobile devices.
While telecommunication facilities are very important, towers and other installations are not located in
visually prominent locations.
17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 , Planning report/Plans MCU12/0036Related documentApplication case desk ↗
About this file
- File size
- 28.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.