Planning Report
Response:
The proposed development is consistent with this DEO. The proposal seeks approval for a
telecommunication facility to service the central and southern areas of Cooroy. Consequently, it is
appropriate to locate the facility at the existing Telstra exchange, between the main commercial strip
and the railway station. Due to the elevated location, the tower will be limited to 25 metres. It will be
relatively concealed from the main street by the adjacent commercial development. It will be visible
from the residential development on the eastern side of the railway line, however its prominence will
be shared with other poles and wires in the vicinity.
6.3 Definition
Under the Planning Scheme, the proposed development is defined as a Service and Utility -
Type 3 Tower.
The planning scheme definition is outlined as follows:
Service and utility: means any premises used for the delivery of a public service not otherwise defined. The
term includes the following types:
Type 3 Tower The use of premises for a tower, antennas or mast and supporting shelter or
-
equipment, in the provision or supply of electricity or telecommunications. The use excludes facilities
deemed to be "Low Impact Facilities" under the Telecommunication (Low Impact Facility)
Determination Act 1997, and excludes power poles. The use includes a telecommunication tower,
wind turbine, high voltage transmission lines (11Okv or greater).
Given the proposal involves the development of a tower for the provision of telecommunications; the
proposed facility requires assessment against Planning Scheme Policy 23 (PSP23).
6.4 Zoning
The level of assessment is determined from the tables contained in the Cooroy & Lake Macdonald Locality
Plan under the Community Services Zone Level of Assessment Table. The proposed Service and Utility-
Type 3 Tower development is considered Impact Assessable. Figure 6 illustrates the Community Services
zoning of the site.
18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 , Planning report/Plans MCU12/0036Related documentApplication case desk ↗
About this file
- File size
- 28.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.