Council archive · source document
Approved Plans 3 of 4 Stormwater OPW20-0145 · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
JOINS PLAN 1856-SW06
5
37
5
LEGEND - NEW WORKS EXTENT DN
37
DN
E
600 DRIV
N
DN525 HOFMANN 525
5
D
37
DN
DN
PROPOSED AC SEAL
D
LOT 15
D
N
N
37
37
5
5
PROPOSED CONCRETE DRIVEWAY
TO IPWEAQ RS-051 REFER 1856-R34 FOR TYPES
RO
FUTURE CONCRETE DRIVEWAY (TO BE CONSTRUCTED FOR HOFMANN DR TREE AD
LATER) TO IPWEAQ RS-051 REFER 1856-R34 FOR TYPES PIT DETAIL PLAN REFER FOR STORMWATER PIPE SIZES A
REFER TO 'STORMWATER
DN375
TO PLAN 1856-SW25
LONGITUDINAL SECTIONS
PROPOSED AC DRIVEWAY
FOR TYPICAL LOT BIORETENTION DN3
FOR ROAD B TREE PIT DETAIL 75
BASIN REFER TO PLAN 1856-SW24
PLAN REFER TO PLAN 1856-SW25
PROPOSED CONCRETE FOOTPATH LOT 16
LOT 14
5
PROPOSED CONCRETE ISLAND 37
DN
2m
D FOR ROAD A BIORETENTION
6m
PROPOSED TURFING N DN
52 BASIN REFER TO PLAN 1856-SW19
WI
5 45
0
DE
LOT 10
EM
0
60 50
T
5.5
PROPOSED VEGETATION AREA 4
DN DN
63
B
RO AD
m
DN525
PROPOSED BIO-RETENTION BASIN
DN
3m
BASIN
45
5.55
B1 KERB
0
PROPOSED BARRIER KERB (B1 TYPE)
5.564m
450mm CHANNEL [ROAD EDGE] FOR STRUCTURE 1/2 OUTLET
DETAIL REFER TO PLAN 1856-SW27
FOR STORMWATER PIPE SIZES
SM4 KERB LOT 13 REFER TO 'STORMWATER
PROPOSED SEMI MOUNTABLE KERB
TYPE (SM4) 160mm FACE [TRAFFIC ISLAND] LONGITUDINAL SECTIONS
PROPOSED EARTHWORKING LOT 11
SLOPE
FOR TYPICAL LOT BIORETENTION
BASIN REFER TO PLAN 1856-SW24 LOT 12
PROPOSED SWALE DRAIN
PROPOSED STORMWATER FOR NEW EARTHWORKS OVER
DRAINAGE LOTS 10 TO 16 REFER TO
PLANS 1856-EW01 TO EW10
LOT 5
JOINS PLAN 1856-SW06
FOR TYPICAL LOT BIORETENTION
ATTENTION: STORMWATER PIPES SP222982 BASIN REFER TO PLAN 1856-SW24
ALL STORMWATER PIPES ARE TO BE FOR BUSHFIRE ACCESS DRIVEWAY
REINFORCED CONCRETE PIPES (RCP) PROVIDE DN525 RCP SW PIPE AS
WITH RRJ JOINTS UP TO DN750 THERE IPWEAQ RS-056
AFTER TO BE FLUSH JOINT (FJ)
E
ATTENTION:
IV
IT IS THE CONTRACTORS RESPONSIBILITY
DR
TO NOTIFY THE ADJACENT PROPERTY
HAY
OWNERS PRIOR TO ANY WORKS
COMMENCING ONSITE
R
LTE
WA
CAUTION:
EXISTING SERVICES THE CONTRACTOR IS
-
TO DETERMINE THE EXACT LOCATION OF
ALL EXISTING SERVICES IN THE VICINITY
NOOSA COUNCIL
OF THE PROPOSED WORKS PRIOR TO THE
START OF ANY CONSTRUCTION. THE COST APPROVED PLAN BUSHFIRE ACCESS DRIVEWAY TO BE
OPW20/0145 17 DEC 2020
OF ANY RECTIFICATION WORKS DUE TO GENERAL IN ACCORDANCE WITH
DAMAGE TO EXISTING SERVICES SHALL BE
IPWEAQ STANDARD DRAWING RS-056
BORNE BY THE CONTRACTOR.
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
A 19-02-20 FOR APPROVAL MM CL
B 24-08-20 REVISED STORMWATER ALIGNMENT MM CL DATUM AHD SHEET: 5 OF 30
0 10 20 30 40 50m
C
D
21-09-20
16/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
E 26-11-20 REVISED AS PER COUNCIL RFI [5-11-20] MM CL SCALE 1:1000 A3 p 07 5443 8285 ABN 89 215 591 077
F 10-12-2020 AMENDED LINE 24 BIO BASIN MINOR CHANGES DTB DTB DESIGN CHECK CL (RPEQ 19358) e [email protected] w www.barlowshelley.com.au SW05 F
This drawing is not to be copied or amended without written permission from a PO Box 899, Maroochydore,4558
DATE 13-09-19 Barlow Shelley Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans 3 of 4 Stormwater OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.