Approved Plans 3 of 4 Stormwater OPW20-0145 · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
JOINS PLAN 1856-SW09
75
D N3 FOR STORMWATER PIPE SIZES LOT 3
00 REFER TO 'STORMWATER
DN9 4.004 Ha
FH LONGITUDINAL SECTIONS
DN
75
0
LOT 4 LOT 7
5 FOR ROAD C BIORETENTION
DN3
7
BASIN REFER TO PLAN 1856-SW21 2.963 Ha
C
AD -
RO
HO
NOOSA COUNCIL
D
N
APPROVED PLAN
FM
75
0
OPW20/0145 17 DEC 2020
AN
N
LOT 5 LOT 8
DR
LOT 6
IV
5
E
37
N
D
DN3 FOR ROAD C BIORETENTION
5
37
75 BASIN REFER TO PLAN 1856-SW20
DN
LOT 15 DN
67 45
0 FOR STORMWATER PIPE SIZES
5 D
N LOT 9 REFER TO 'STORMWATER
5
LONGITUDINAL SECTIONS 67
5
DN
37
5
DN
37
DN
600
N
5 E
25
IV
D
DN525 D N5
D N9
DN525
37
DR
DN
AY
00
D
D
25 H
N
D N5
N
37
ER
37
4m
11.74
5
T
5
AL
4m SW
12m
W
5
52
DN
EMT
JOINS PLAN 1856-SW07
FOR STRUCTURE 1/12 OUTLET
RO DETAIL REFER TO PLAN 1856-SW27
FOR STORMWATER PIPE SIZES AD
REFER TO 'STORMWATER
DN375
A
LONGITUDINAL SECTIONS
FOR ROAD B TREE PIT DETAIL
LOT 16 DN3
75 SAW CUT & BREAK UP EXISTING TRAFFIC
PLAN REFER TO PLAN 1856-SW25 ISLAND AS REQUIRED TO CONSTRUCT
NEW BIORETENTION BASIN. REFER TO
STORMWATER DRAWINGS FOR DETAILS
B
LOT 14
D
5
A
37
RO
DN
2m
D FOR ROAD A BIORETENTION
6m
N DN
52 BASIN REFER TO PLAN 1856-SW19
WI
5 45
0
DE
EM
60
0
50 LOT 10
T
4
DN DN
DN525
ATTENTION: STORMWATER PIPES
DN
FOR NEW EARTHWORKS OVER ALL STORMWATER PIPES ARE TO BE
3m
LOTS 10 TO 16 REFER TO
45
REINFORCED CONCRETE PIPES (RCP)
5.55
0
PLANS 1856-EW01 TO EW10 WITH RRJ JOINTS UP TO DN750 THERE
5.564m
AFTER TO BE FLUSH JOINT (FJ)
FOR STORMWATER PIPE SIZES
LOT 13 REFER TO 'STORMWATER
LONGITUDINAL SECTIONS ATTENTION:
IT IS THE CONTRACTORS RESPONSIBILITY
TO NOTIFY THE ADJACENT PROPERTY
LOT 11 OWNERS PRIOR TO ANY WORKS
COMMENCING ONSITE
LOT 12 CAUTION:
EXISTING SERVICES THE CONTRACTOR IS
TO DETERMINE THE EXACT LOCATION OF
ALL EXISTING SERVICES IN THE VICINITY
E
IV OF THE PROPOSED WORKS PRIOR TO THE
FOR TYPICAL LOT BIORETENTION DR START OF ANY CONSTRUCTION. THE COST
BASIN REFER TO PLAN 1856-SW24 Y OF ANY RECTIFICATION WORKS DUE TO
HA DAMAGE TO EXISTING SERVICES SHALL BE
R
TE BORNE BY THE CONTRACTOR.
AL
JOINS PLAN 1856-SW05 W
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED 1856
A 19-02-20 FOR APPROVAL MM CL
B 24-08-20 REVISED STORMWATER ALIGNMENT MM CL DATUM AHD SHEET: 6 OF 30
0 10 20 30 40 50m
C
D
21-09-20
16/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
E 26-11-20 REVISED AS PER COUNCIL RFI [5-11-20] MM CL SCALE 1:1000 A3 p 07 5443 8285 ABN 89 215 591 077
F 10-12-2020 AMENDED LINE 24 BIO BASIN MINOR CHANGES DTB DTB DESIGN CHECK CL (RPEQ 19358) e [email protected] w www.barlowshelley.com.au SW06 F
This drawing is not to be copied or amended without written permission from a PO Box 899, Maroochydore,4558
DATE 13-09-19 Barlow Shelley Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans 3 of 4 Stormwater OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.