24-0578 Structural Issue A(3)(1)
SITE CLASSIFICATION: 25 100 Extrusions neglected
Proposed internal stormwater drainage details have not been provided to Typical.
The site classification for this block, based on the attached soil
HR Design Group at the time of design. All footings and slabs within the
report, is Class 'N/A' as per AS2870. 'Residential Slabs and Footings'.
zone of influence must be deepened via piers to ensure building loads are
100 25
transferred to competent material below any service trenches. Contact
EARTHWORKS: HR Design Group for details as required.
1. Prepare the existing foundation below by removal of any top-soil
25 200
containing organic matter which could inhibit compaction
2. Proof roll the foundation and remove and reconstruct areas that
break up or show evidence of movement under proof loading. All footings to be founded on STIFF CLAYS or DENSE SANDS
with an allowable bearing capacity of 100kPa. Engineer to be 200 25
3. Sand filling under slabs or footings shall be placed in 200mm
on site during excavation to confirm founding material and
max layers, (Uncompacted), Compacted in accordance with AS1289
bearing capacity.
E5.1 (Density to be greater than 65% in accordance with AS1289 E6.1) 25 200
4. Fill material other than sand (ie gravel, decomposed rock or
broken rock, free from organic material and lumps of clay) under
slabs or footings to be compacted to achieve an density ratio 100
(calculated by AS1289 E4.1) of not less that 95% at maximum
dry density as determined by AS 1289 E1.1 Slab mesh lapping details
Alternatively fill is to be placed an machine track rolled and piers
drilled/installed as per the layout plan. Compaction testing is then
not required due to the presence of supporting piers.
5. All Earthworks to be carried out in accordance with AS 3798 315 outer diameter tube.
FOOTINGS: Filled with concrete, N50/20.
1. All footings are to be deepened through any soft spots and bear Provide 6/N12 bars
a minimum of 300mm into Recommended Founding Material with and R10 helix with 150mm pitch.
a minimum bearing capacity of 100kPa
2. Construct footings under all load bearing walls
SLAB:(UNO)
1. To be a minimum of 100mm thick.
2. Reinforcement to be a minimum of SL82 Mesh with 30mm cover.
50mm compacted sand bed with 0.2mm Visqueen Moisture barrier
Approx Broadwater Bottom
to AS 3360.1 required under slab.
3. Deepen slab to 150mm thick under all bracing walls or position
where Chemical or Mechanical anchor bolts are to be used.
undary
SITE MAINTENANCE:
Property Bo
1. Finished ground surface must be shaped to direct water away
from building area in accordance with the BCA requirements.
Refer to attached CSIRO BTF18: Foundation Maintenance and
Footing Performance and Homeowners Guide for further Guidance
TBC by specialist contractor
on site Maintenance
GENERAL:
1. These drawings are to be read in conjunction with HR Design Group
Specification FS.01.
P1
Denotes 315Ø jetted concrete piles
to achieve minimum working loads:
Vertical load capacity - 21kN
Horizontal load capacity - 4kN
P1
Pile depth to be confirmed with
P1 P1 P1 P1 specialist contractor and install piles
achieve minimum working loads:
Vertical load capacity - 21kN 315mm Ø
Horizontal load capacity - 4kN
Denotes line of Confirm depth with engineer
deck over Existing revetment wall prior to construction
P1 - 315Ø PILE REINFORCEMENT
65mm
315 outer diameter tube.
cover
Filled with concrete, N50/20.
Provide 6/N12 bars
and R10 helix with 150mm pitch.
315mm Ø
Property Boundary
FOR OVERALL DIMENSIONS OF SLAB AND FOOTINGS, REFER ARCHITECTURAL DRAWING
Issue Made By Date Description PROPOSED NEW JETTY Scale : 1:100 NOTES:
A LL 21/11/24 Issue for construction
at LOT 91 (#25) SEAMOUNT QUAY, NOOSAVILLE
REVISION
Job No.: 24-0578 1. Do not scale drawings.
2. Scale is correct at A3.
BUILDER: PONTOON WORKS
Dwg No.: S02 3. Check and verify all dimensions
Designed By : L.LITTLE Drawn By : LL Date : 21/11/24 prior to commencement of work.
Certified By : B.R. CROMAR BEng (Civil) MIEAust CPEng RPEQ NER Date : 21/11/24 Ph: (07) 5444 5578 Email: [email protected] FOOTING LAYOUT & DETAILS