Original source · versioned page text
2023-02-07 Planning & Environment Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2023
Performance Bond
19. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
Street Identification
20. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
DURING CONSTRUCTION
Retention of Existing Trees and Vegetation
21. All trees and surrounding vegetation identified on the detailed survey DWG 204099
004 DS rev 0 for retention must be protected in accordance with AS 4970, Protection
of trees on development sites.
22. A qualified person * must be engaged for the duration of the works to:
a. Oversee installation of all tree protection fencing prior to commencement of any
works onsite.
b. Supervise tree protection within the development site and frontages, prior to,
during and following construction in accordance with AS 4970, Protection of trees
on development sites.
c. Undertake a risk assessment of the ‘Pandanus tectorius’ that is extending within
the development footprint, and carry out amenity pruning in accordance with AS
4373, Pruning of amenity trees to protect the tree during the construction
process.
*(Refer to Advisory Note)
Water & Sewer Connections
23. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Services
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements
of this Decision Notice and all applicable legislation at the time of construction.
Page 29 of 71
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.