PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2023
Easements
26. Unless otherwise agreed in writing by the relevant service provider, any public or third-
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
27. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
DEMOLITION WORKS
Performance Bond
28. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000
must be submitted to Council prior to the issue of a Development Permit for Building
Works for demolition, to secure the demolition conditions of this approval. The cash
bond or trading bank guarantee will be returned on performance of the demolition
conditions of this approval less any costs incurred by Council in respect of enforcing
performance of these demolition conditions. Council reserves the right to call upon the
bond or guaranteed sum to effect compliance with conditions.
Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting,
air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any
other emissions in accordance with the nuisance provisions of the Environmental
Protection Act 1994.
Waste Management
29. A Waste Management Plan (demolition) must be submitted in accordance with
Planning Scheme Policy PSP9 - Waste Management and approved by Council’s Waste
Coordinator prior to issue of a development permit for Building Works for demolition,
removal, or relocation.
The purpose of the Waste Management Plan is to facilitate the segregation of waste
for the effective reuse and recycling of such materials. Segregated wastes attract
significantly reduced disposal fees at the landfill with some items free. Higher gate fees
are charged for mixed waste.
Waste storage areas must provide for adequate separation of all reusable, recyclable
and waste materials. These must be located so that they are convenient and safe to
use.
The Plan must contain the following information:
a. The areas for the storage and separation of waste shown on a site plan;
Page 30 of 71
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.