NOOSAVILLE FORESHORE INFRASTRUCTURE MASTERPLAN · Report
SERVICES & ORGANISATION COMMITTEE MEETING 10 JUNE 2025
Informal discussions with staff and consultants working on these projects in the region indicate that
that Noosa Council’s expenditure on the Noosaville Foreshore Infrastructure Master Plan as being
modest in comparison. The total cost of the preparation of the Noosaville Foreshore Infrastructure
Master Plan, inclusive of all staff, engagement and consultants costs is considered to be well within
industry benchmarks.
Risk & Opportunities
There are a wide range of risks if the final Master Plan is not approved. This risk directly impacts
Council's ability to subsequently address the range of public domain community concerns,
infrastructure and asset management, amenity, level of service, foreshore erosion and tidal
inundation.
The third phase of community engagement (November to December 2024) provided the opportunity
to re-engage meaningfully with the public and private sectors to ensure the formation of a successful
final Master Plan. The outcomes from the latest phase of community consultation resulted in a
Master Plan which embodies responsive design strategies but also captures and reflects the
communities stated desires for the foreshore.
Risk
Level
Risk (High, Mitigation
Medium,
Low)
Community / Cultural
Not having a Master Plan in High Formally approve the Plan. The final phase of
place would result in the community engagement provided the opportunity to
substantial delay of addressing re-engage meaningfully with the public and private
the comprehensive planning for sectors, to ensure the formation of a successful final
a range of open space, asset Master Plan. The outcomes from the latest phase of
and infrastructure issues for a community consultation, resulted in a Master Plan
Shire-wide and this district-level which embodies responsive design strategies but
parkland and key local centre also captures and reflects the community’s stated
location. desires for the foreshore.
Not having a Master Plan in High Formally approve the Plan. The final Master Plan
place could result in low presented in this report for Council approval has
confidence from the community responded to extensive community consultation
for Council to successfully feedback (over 1000 residents engaged) and reflects
deliver outcomes reflective of significant changes from the draft Master Plan
the respondent concerns and presented in June 2024. Key topics such as
responsive planning. carparking, tennis court, playgrounds, boating, public
amenities, pathways, river edge treatments were
addressed, and the final Master Plan was well
received with overwhelmingly positive feedback
during the last and third round of community
engagement.
Some community members and Low The findings from the latest phase of community
organisations may reject the consultation were notably positive, indicating a
final revised Master Plan and its majority of community stakeholders accepting the
accompanying communications revised Master Plan which embodies responsive
engagement material. design strategies but also captures and reflects the
community’s stated desires for the foreshore.