Original source · versioned page text
11. Appendix G - Bushfire Hazard Assessment & Management Plan
Bushfire Hazard Assessment & Management Plan v2 NCES REF: J001313 Lot 4 on RP160124 – 658 Louis Bazzo Dr, Ringtail Creek QLD 4565 Table 4 – Reproduction of Table 8.2.3.3 Bushfire Hazard Areas – Part 8 Overlay Code Noosa Plan 2020 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSED SOLUTION Safety of people and property PO1 AO1.1 This Bushfire Hazard Assessment and Management Plan has been prepared to Development maintains the safety of people and Development which will materially increase the number of people maintain the safety of people and property from the adverse impacts of bushfire. property from the adverse impacts of bushfire. living or congregating on premises, including reconfiguring a lot, is not AO1.1 –The proposed development is located outside of a mapped Very High, located within a medium or high bushfire hazard area. High, and Medium Potential Bushfire Intensity areas as depicted on the Local Hazard Area Map (refer Plan BF03). AO1.2 Development maximises setbacks from hazardous vegetation to AO1.2 – The wedding marquee (the only proposed building) has been provided achieve an acceptable risk. with appropriate separation from the adjacent hazardous vegetation; SU9b, to satisfy the SPP Assessment Benchmark 4 criteria of <29kW/m2 radiant heat flux Editor’s Note —PSP8 Natural Hazards provides guidance for exposure. assessing bushfire hazard risk and preparing a bushfire hazard management plan. Impact on Ecologically Important Areas PO2 No acceptable outcome provided PO2 – No vegetation clearing is required to satisfy the APZ recommendations. Bushfire mitigation measures do not adversely impact A minor amount of vegetation clearing/delimbing may be required to facilitate the on: vehicular access recommendations about the waterway crossings for the emergency alternative access route to achieve a minimum 3.5m width and 4.8m a) biodiversity values, connectivity and ecosystem vertical clearance. All vegetation clearing required to facilitate the vehicular functioning; and access recommendations can likely be carried out as exempt clearing under the routine management (a) definition of the Planning Regulation 2017 if restricted b) the long term physical integrity of waterways, wetland to 10m width. and areas of native vegetation. Refer NCES Ecological Assessment Report v1 2024 for detailed response for impacts to ecological values. Water Supply for Fire Fighting Purposes AO3.1 – No reticulated water is currently available to the site. PO3 AO3.1 The water supply requirements of SPP Assessment Benchmark 5 prevails and Development provides an adequate water supply for Premises are connected to the reticulated water supply. can be conditioned with an approval (as recommended in Section 5.3). firefighting purpose which is reliable, safely located and freely accessible. Editor's note—For reconfiguring a lot, water supply needs to provide for a minimum flow and pressure of 10 litres a second at 200kPa at all Note, the reliance upon dams or pools for water storage is not an acceptable times for firefighting purposes. solution under the SPP. OR AO3.2 Where there is no available reticulated water supply, the premises has: a) an accessible dam, swimming pool or water tank available for firefighting purposes with an onsite water volume of not less than 5,000 litres; and b) a water supply outlet pipe 50 millimetres in diameter fitted with a © 2024 33
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (11. Appendix G - Bushfire Hazard Assessment & Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.