Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

11. Appendix G - Bushfire Hazard Assessment & Management Plan

of 85

Page text read automatically using OCR, there may be inaccuracies

Bushfire Hazard Assessment & Management Plan v2                                                                                                                                                                NCES REF: J001313
Lot 4 on RP160124 – 658 Louis Bazzo Dr, Ringtail Creek QLD 4565




Table 4 – Reproduction of Table 8.2.3.3 Bushfire Hazard Areas – Part 8 Overlay Code Noosa Plan 2020


 PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                                      PROPOSED SOLUTION

 Safety of people and property

 PO1                                            AO1.1                                                                                      This Bushfire Hazard Assessment and Management Plan has been prepared to
 Development maintains the safety of people and Development which will materially increase the number of people                            maintain the safety of people and property from the adverse impacts of bushfire.
 property from the adverse impacts of bushfire. living or congregating on premises, including reconfiguring a lot, is not
                                                                                                                                           AO1.1 –The proposed development is located outside of a mapped Very High,
                                                located within a medium or high bushfire hazard area.
                                                                                                                                           High, and Medium Potential Bushfire Intensity areas as depicted on the Local
                                                                                                                                           Hazard Area Map (refer Plan BF03).
                                                                  AO1.2
                                                                  Development maximises setbacks from hazardous vegetation to              AO1.2 – The wedding marquee (the only proposed building) has been provided
                                                                  achieve an acceptable risk.                                              with appropriate separation from the adjacent hazardous vegetation; SU9b, to
                                                                                                                                           satisfy the SPP Assessment Benchmark 4 criteria of <29kW/m2 radiant heat flux
                                                                  Editor’s Note —PSP8 Natural Hazards provides guidance for                exposure.
                                                                  assessing bushfire hazard risk and preparing a bushfire hazard
                                                                  management plan.


 Impact on Ecologically Important Areas

 PO2                                                  No acceptable outcome provided                                                       PO2 – No vegetation clearing is required to satisfy the APZ recommendations.
 Bushfire mitigation measures do not adversely impact
                                                                                                                                           A minor amount of vegetation clearing/delimbing may be required to facilitate the
 on:
                                                                                                                                           vehicular access recommendations about the waterway crossings for the
                                                                                                                                           emergency alternative access route to achieve a minimum 3.5m width and 4.8m
 a) biodiversity values, connectivity and ecosystem                                                                                        vertical clearance. All vegetation clearing required to facilitate the vehicular
 functioning; and                                                                                                                          access recommendations can likely be carried out as exempt clearing under the
                                                                                                                                           routine management (a) definition of the Planning Regulation 2017 if restricted
 b) the long term physical integrity of waterways, wetland
                                                                                                                                           to 10m width.
 and areas of native vegetation.
                                                                                                                                           Refer NCES Ecological Assessment Report v1 2024 for detailed response for
                                                                                                                                           impacts to ecological values.

 Water Supply for Fire Fighting Purposes
                                                                                                                                           AO3.1 – No reticulated water is currently available to the site.
 PO3                                                        AO3.1
                                                                                                                                           The water supply requirements of SPP Assessment Benchmark 5 prevails and
 Development provides an adequate water supply for Premises are connected to the reticulated water supply.
                                                                                                                                           can be conditioned with an approval (as recommended in Section 5.3).
 firefighting purpose which is reliable, safely located and
 freely accessible.                                         Editor's note—For reconfiguring a lot, water supply needs to provide
                                                            for a minimum flow and pressure of 10 litres a second at 200kPa at all         Note, the reliance upon dams or pools for water storage is not an acceptable
                                                            times for firefighting purposes.                                               solution under the SPP.

                                                                  OR

                                                                  AO3.2
                                                                  Where there is no available reticulated water supply, the premises
                                                                  has:

                                                                  a) an accessible dam, swimming pool or water tank available for
                                                                  firefighting purposes with an onsite water volume of not less than
                                                                  5,000 litres; and
                                                                  b) a water supply outlet pipe 50 millimetres in diameter fitted with a




© 2024                                                                                                             33

Log in to download the original (11. Appendix G - Bushfire Hazard Assessment & Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.