Original source · versioned page text
11. Appendix G - Bushfire Hazard Assessment & Management Plan
Bushfire Hazard Assessment & Management Plan v2 NCES REF: J001313 Lot 4 on RP160124 – 658 Louis Bazzo Dr, Ringtail Creek QLD 4565 7.2 State Planning Policy – Natural Hazards, Risk and Resilience The Department of State Development, Manufacturing, Infrastructure and Planning’s State Planning Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December 2019) contains the development assessment benchmarks for natural hazards, risk and resilience - bushfire. The SPP assessment benchmarks prevail over those prescribed in the NSC Bushfire Hazard Overlay Code where they involve the same design elements. An assessment of the proposed development’s compliance with each of the assessment benchmarks has been provided below. Assessment Benchmark 4 To ensure emergency services can respond effectively, development is located within a reticulated water supply area or includes a dedicated static water supply that is available solely for fire-fighting purposes and can be accessed by fire-fighting vehicles. Reticulated water is not available to the site. The proposed development will therefore require provision of a readily accessible on-site emergency static water supply in accordance with Assessment Benchmark 4 of the SPP Bushfire 2019. Assessment Benchmark 4 references the QFES 2019 Bushfire Resilient Communities document for information regarding appropriate static water supply. Section 9.1 of Bushfire Resilient Communities’ states: An appropriate static water supply (in bushfire prone areas where reticulated supply is not provided) to support effective emergency services response includes a water tank that is available solely for firefighting purposes and can be accessed by firefighting appliances. The water tank is to be provided within 10 metres of each building (other than a class 10 building), which: a) is either below ground level or of non-flammable construction; b) has a take-off connection at a level that allows the following dedicated, static water supply to be left available for access by firefighters: i.10,000 litres for residential buildings; ii. for industrial, commercial and other buildings, a volume specified in AS 2304–2011 Water storage tanks for fire protection systems; c) is protected from bushfire attack, including shielding of tanks and pump in accordance with AS2304–2011 Water storage tanks for fire protection systems; d) allows medium rigid vehicle (15 tonne fire appliance) clear access within six metres of the tank e) if serviced by a rural fire brigade, i provided with rural fire brigade tank fittings of a 50-millimetre ball valve and male camlock coupling and, if underground, an access hole of 200 millimetres (minimum) to accommodate suction lines; f) is clearly identified by directional signage at the street frontage. Therefore, the prescribed 10,000 litres for a residential building is recommended for the wedding marquee (the only proposed building). This amount is to be reserved for firefighting purposes only and provided in a non-combustible tank located within 10m of the building and within 6m of a hardstand area that can be used by QFES vehicles. To facilitate safe evacuation during a bushfire event, include a development footprint plan that is located within 60 metres of the street frontage and sited to enable a route between the development footprint plan and the street frontage with a gradient that does not exceed of 12.5 per cent. Due to the size and shape of the site (i.e., approx. 800m long access handle), a 60m route between the development footprint plan and street frontage in unachievable. The proposed primary access route exhibits grades of approximately 1-6° (i.e., <12.5%) and is proposed to utilise an existing farm track. The proposed emergency alternative access route to and from the wedding marquee utilises the alignment of an existing farm track and exhibits grades of approximately 1-6° (i.e., <12.5%). Access route recommendations have been set in Section 5.5 and are intended to facilitate safe evacuation during a bushfire event. © 2024 36
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (11. Appendix G - Bushfire Hazard Assessment & Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.