Original source · versioned page text
2018-06-12 Planning & Environment Committee Agenda
The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JUNE 2018
General
6. Security in the form of a cash bond or trading bank guarantee to the sum of $25,000
must be submitted, to secure performance of all conditions of this approval, prior to
the Prestart Meeting for Operational Works for this stage of development (Stage 6).
The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit and the related operational works approval/s.
7. The requirements of this development approval are to be effected, prior to the use of
the premises. Council reserves the right to call upon the bond or guaranteed sum
referred to in this approval to effect compliance with conditions.
8. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
off-site parking impacts, excessive noise, lighting nuisance or other emissions.
Access
9. Access to Stage 6 must be from the existing entry point to the Palm Lakes
development.
Landscaping Works
10. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area and the approved Statement of Landscape Intent plan. This plan (as amended)
must include a 2 metre landscaped buffer with dense landscaping to existing
Prospect Place residences adjoining to the east.
11. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
Noise Management
12. The location and operational hours of mechanical plant equipment including domestic
air conditioning units, is not to create a noise nuisance to occupiers.
13. Noise from building works associated with residential development must comply with
the following–
a. Limited to between 7:00am to 6:30pm Monday to Saturday.
b. All reasonable measures are taken to minimise noise emissions.
c. Not permitted on Sunday or public holidays.
Fencing
14. Fencing is to be erected on the eastern and northern boundaries of the site and shall
have a minimum height of 1.8 metres.
15. Fencing along the eastern boundary line adjoining Prospect Park must be designed
and constructed in accordance with Plan No. L006 Rev C, dated 22 February 2018 of
the Statement of Landscape Intent document, prepared by BVLD Consulting.
External Landscaping and Roadworks
16. All external roadworks, frontage and landscaping works associated with
MCU15/0111/OPW17/0055 must be completed and accepted by the relevant
authority, (including the required bus stops and all road and landscaping works along
Elm Street) prior to the commencement of the Operational Works associated with this
stage of development (Stage 6).
Page 41 of 97
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.