2018-06-12 Planning & Environment Committee Agenda

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        12 JUNE 2018


          Existing Access Driveway Removal and Frontage Works
    17.   The existing redundant access driveway must be removed and the area be reinstated
          in accordance with a Development Permit for Operational Works, the works shall
          include but not limited to the following:
          a.    The access crossover and/or driveway laybacks must be removed, and the
                kerb, footpath and verge area reinstated in a manner to match the footpath,
                kerb and/or verge treatments; and
          b.    The access driveway within the property must be removed and be reinstated
                and landscaped in accordance with approved plans.
          Road Dedication
    18.   Prior to commencement of use a Plan of Survey for boundary realignment must be
          endorsed by Council for road reserve dedication along the frontage of Palm Lake
          development site to the cul-de-sac head of Trading Post Road to ensure that the
          existing public pathway is fully located within the road reserve and a 1.0m clearance
          is provided between the edge of the pathway and the property boundary line.
          Internal Driveways and Parking
    19.   The internal roads shall be concrete or bitumen sealed driveway generally in
          accordance with the approved plans and must comply with the relevant sections of
          AS/NZS 2890.1-2004 and/or AS 2890.2-2002. A Development Permit for Operational
          Works shall be required.
    20.   All parking areas and garages must be in compliance with the requirement of the
          current Australian standards applicable to their use (AS/NZS 2890.1-2004 and/or AS
          2890.2-2002) with a minimum head clearance (headroom) at any point of 2.3m.
    21.   Carparking shall be provided on site, at a minimum rate of 1 space per independent
          living unit for resident parking and 1 space per 4 independent living units for visitor
          parking.
          Earthworks
    22.   All earthworks must be carried out in accordance with a Geotechnical Report
          prepared by a qualified person* and endorsed through a Development Permit for
          Operational Works approval. *(Refer to Advisory Note)
    23.   All earthworks shall be undertaken in accordance with the provisions of AS 3798
          Guidelines on Earthworks for Commercial and Residential Development, with
          geotechnical testing undertaken in accordance with Section 8 of the Standard, and to
          a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS
          3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ
          and submitted to Council prior to final inspection/s of works.
    24.   A registered practicing Geotechnical Engineer shall test the existing ground
          conditions for suitability of placing additional fill, prior to such fill being placed.
    25.   Filling works shall be restricted to the subject site itself, and the finished fill levels are
          to taper to the existing levels on the property. Batters shall be at a maximum grade
          of 1:4 unless retained by an engineer-designed wall or approved retention method.
    26.   Any fill imported to the site may only be from a site licensed with The Environmental
          Protection Agency or from a site for which a Development Permit for Operational
          Works has been issued approving the export of fill.
    27.   Following completion of the filling works for each Stage, the registered practicing
          Geotechnical Engineer supervising the works shall submit compaction tests across
          the entire filled areas and make recommendations if special foundations
          requirements will apply.

                                                                                        Page 42 of 97
Log in to download the original file

2018-06-12 Planning & Environment Committee Agenda(PDF, 11MB).pdf · 11.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.