PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JUNE 2018
36. Any proposed Community Management Statement required for the development
must include the approved Stormwater Management Plan by Calibre Consulting
dated February 2017 Doc Number 16-001014-02C and must include the full cost of
maintaining the system in accordance with that document.
37. A suitably qualified Registered Professional Engineer, specialising in hydraulics shall
prepare engineering drawings and specifications for stormwater designs and shall be
submitted in conjunction with an application for a Development Permit for Operational
Works.
38. Stormwater pipelines within the site shall cater for 10% AEP storm event and
secondary flow paths shall be provided within the site to cater for 1% AEP storm
event.
39. The development must not adversely impact on the existing drainage conditions on
other properties. The applicant must demonstrate that all stormwater runoffs from the
fully developed site must be maintained at predevelopment rates for all storm events
up and including 1% AEP storm event.
Street Lighting
40. Streets lighting and pathways lighting throughout the development site must be
provided in accordance with Australian Standards.
Telecommunication
41. The requirements for telecommunication services shall be satisfied in relation to the
provision of new telephone services and broadband services to the developed site. In
this regard written confirmation from an approved telecommunication agency shall be
submitted to the Council prior to commencement of use.
Waste Management
42. The operator must provide a waste collection service for proposed units 221-230 as
described in the Waste Management Plan, prepared by Burchills Engineering
Solutions dated February 2018.
Bushfire Management
43. The development must be carried out in accordance with sections 5 and 6 of the
Bushfire Hazard Assessment Report, prepared by Brisbane Bushfire Consulting,
dated March 2018.
44. Certification must be submitted to Council from a qualified person* which certifies that
the development has been constructed in accordance with the bushfire management
conditions of this Decision Notice.
*(Refer to Advisory Note)
B. The assessment finds the following grounds to support the proposal, despite the conflict
with The Noosa Plan:
1. The development provides a logical extension of the approved retirement use on
adjacent land and will support the retirement housing needs of Cooroy.
2. The rural zoned allotment does not support any significant rural activities or
agricultural values and the development will not affect Cooroy’s rural production
capacity.
3. The development will not adversely impact on existing residential and rural uses in
the area.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 44 of 97
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.