Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2018-06-12 Planning & Environment Committee Agenda

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    12 JUNE 2018


     36.   Any proposed Community Management Statement required for the development
           must include the approved Stormwater Management Plan by Calibre Consulting
           dated February 2017 Doc Number 16-001014-02C and must include the full cost of
           maintaining the system in accordance with that document.
     37.   A suitably qualified Registered Professional Engineer, specialising in hydraulics shall
           prepare engineering drawings and specifications for stormwater designs and shall be
           submitted in conjunction with an application for a Development Permit for Operational
           Works.
     38.   Stormwater pipelines within the site shall cater for 10% AEP storm event and
           secondary flow paths shall be provided within the site to cater for 1% AEP storm
           event.
     39.   The development must not adversely impact on the existing drainage conditions on
           other properties. The applicant must demonstrate that all stormwater runoffs from the
           fully developed site must be maintained at predevelopment rates for all storm events
           up and including 1% AEP storm event.
           Street Lighting
     40.   Streets lighting and pathways lighting throughout the development site must be
           provided in accordance with Australian Standards.
           Telecommunication
     41.   The requirements for telecommunication services shall be satisfied in relation to the
           provision of new telephone services and broadband services to the developed site. In
           this regard written confirmation from an approved telecommunication agency shall be
           submitted to the Council prior to commencement of use.
           Waste Management
     42.   The operator must provide a waste collection service for proposed units 221-230 as
           described in the Waste Management Plan, prepared by Burchills Engineering
           Solutions dated February 2018.
           Bushfire Management
     43.   The development must be carried out in accordance with sections 5 and 6 of the
           Bushfire Hazard Assessment Report, prepared by Brisbane Bushfire Consulting,
           dated March 2018.
     44.   Certification must be submitted to Council from a qualified person* which certifies that
           the development has been constructed in accordance with the bushfire management
           conditions of this Decision Notice.
           *(Refer to Advisory Note)
B.   The assessment finds the following grounds to support the proposal, despite the conflict
     with The Noosa Plan:
     1.    The development provides a logical extension of the approved retirement use on
           adjacent land and will support the retirement housing needs of Cooroy.
     2.    The rural zoned allotment does not support any significant rural activities or
           agricultural values and the development will not affect Cooroy’s rural production
           capacity.
     3.    The development will not adversely impact on existing residential and rural uses in
           the area.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



                                                                                    Page 44 of 97
Log in to download the original file

2018-06-12 Planning & Environment Committee Agenda(PDF, 11MB).pdf · 11.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.