Original source · versioned page text
Decision Notice - Approved by Delegation of Authority - MCU25 0067 (As Published)
Damage to Services and Assets
44. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
PTG/01059-0001 0 Geotechnical Investigation Report, prepared by PTG 06/05/2025
Consulting
10256 A Stormwater Management Plan, prepared by MPN 22/05/2025
Consulting
RH2601-90 A Waste Management Plan, prepared by Rhodium 23/03/2026
Environmental
DA.01 A Bulk Earthworks Plan, prepared by MPN Consulting 19/05/2025
DA.02 A Bulk Earthworks Sections, prepared by MPN 19/05/2025
Consulting
DA.03 A Civil Works Plan, prepared by MPN Consulting 19/05/2025
SK001 C Landscape Concept Plan – Coversheet & Drawing 20 Apr 2026
Index
SK002 C Landscape Concept Plan – Ground Floor Planting 20 Apr 2026
Plan
SK003 C Landscape Concept Plan – First Floor Planting Plan 20 Apr 2026
SK004 C Landscape Concept Plan – Second Floor Planting 20 Apr 2026
Plan
SK005 C Landscape Concept Plan – Third Floor Planting Plan 20 Apr 2026
SK010 C Landscape Concept Plan – Planting Species 20 Apr 2026
Schedule, Images & Notes
6. REFERRAL AGENCIES
Not applicable.
Page 8 of 12
Document Set ID: 25052313
Version: 4, Version Date: 14/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.