Decision Notice - Approved by Delegation of Authority - MCU25 0067 (As Published)

of 12
                      Stormwater Drainage
               34.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval, be generally in accordance with MPN Consulting’s Civil Work Plan (DA.03 Rev A)
                      dated 19/05/2026 and Stormwater Management Plan (10256 Rev A) dated 22/05/2025, and
                      must include in particular:
                      a.      Rainwater storage for reuse, in accordance with Noosa Council’s Planning Scheme
                              Policy 5 - Sustainable Building Design.
                      Condition 34 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Services
               35.    Reticulated electricity and telecommunication services must be provided to each lot in
                      accordance with the standards and requirements of the relevant service provider.
               36.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               37.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               38.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               39.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               40.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               41.    All works must be carried out in accordance with the recommendations contained in PTG
                      Consulting’s Geotechnical Investigation Report (PTG/01059-0001 Rev 0) and dated
                      06/05/2025.
                      Earthworks and Retaining Walls
               42.    All earthworks and associated retaining structures/batters, both above and below ground,
                      both temporary and permanent, must be undertaken in accordance with an Operational
                      Works approval, be generally in accordance with MPN Consulting’s Bulk Earthworks Plan &
                      Sections (DA.01 & DA.02 Rev A) dated 19/05/2025, and contained entirely within the subject
                      site unless written permission from the respective landowner(s) is provided to Council.
               43.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.




                                                                                                      Page 7 of 12
Document Set ID: 25052313
Version: 4, Version Date: 14/08/2026

Log in to download the original (Decision Notice - Approved by Delegation of Authority - MCU25 0067 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.