Decision Notice - Approved by Delegation of Authority - MCU25 0067 (As Published)
Stormwater Drainage
34. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval, be generally in accordance with MPN Consulting’s Civil Work Plan (DA.03 Rev A)
dated 19/05/2026 and Stormwater Management Plan (10256 Rev A) dated 22/05/2025, and
must include in particular:
a. Rainwater storage for reuse, in accordance with Noosa Council’s Planning Scheme
Policy 5 - Sustainable Building Design.
Condition 34 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
35. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
36. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
37. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
38. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
39. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
40. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
41. All works must be carried out in accordance with the recommendations contained in PTG
Consulting’s Geotechnical Investigation Report (PTG/01059-0001 Rev 0) and dated
06/05/2025.
Earthworks and Retaining Walls
42. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be undertaken in accordance with an Operational
Works approval, be generally in accordance with MPN Consulting’s Bulk Earthworks Plan &
Sections (DA.01 & DA.02 Rev A) dated 19/05/2025, and contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
43. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Page 7 of 12
Document Set ID: 25052313
Version: 4, Version Date: 14/08/2026