F - Traffic Response and Revised Traffic Impact Assessment (17.09.19)
Original PDF page 39, section 1. The text section number identifies this passage in the reader.
20 Hofmann Drive, Noosaville | Traffic Impact Assessment 7.0 Bicycle Parking 7.1 Overview The development includes end of trip facilities and current provisions include 69 bicycle parking spaces. The proposed visitor bicycle parking spaces are to be located adjacent to the T11 and T20 tenancies. We understand that the end of trip (EOT) facilities will be located at ground level within Building 4 and located adjacent to Tenancy 01 / Tenancy 14 as identified in drawing A-DA-0100 which has been prepared by The Buchan Group. A copy of this drawing is included in Appendix A. Longer-term staff bicycle parking facilities are proposed to be located adjacent to the staff carparking area in the north west of Tenancy 01, in the back of house area of the site. 7.2 Review The recommended bicycle parking provisions have been calculated based on the rates identified in Austroads Guide to Traffic Engineering Practice, Part 14 – Bicycles (Austroads Cycling Guide) and a summary of the recommended provision is provided in Table 7.3. Table 7.3 Bicycle Parking Review – Austroads Cycling Guide Austroads Rate Number Bicycle Spaces Land Use Yield Staff Visitor Staff Visitor Total Drive In 10,241m2 GLA 1 / 300m2 1 / 500m2 34.2 20.5 54.7 Shopping Centre Building 4 2,020m2 GLA 1 / 200m2 1 / 750m2 10 2.7 12.7 Office Total 12,261m2 GLA - - 44.2 23.2 67.4 Austroads notes that it can be appropriate to provide 50% of the recommended provisions at the initial development stage and provide additional bicycle parking as demand is realised. There is sufficient space on site to provide bicycle parking as required to meet the provisions outlined above. 7.3 Summary The proposed bicycle parking and end of trip facilities comply with the requirements of The Noosa Plan Division 3 Business Uses Code. The proposed provisions are therefore acceptable from a transport engineering perspective. \\FILE\Projects\BLU0517\01\3. Deliverables\1. Reports\3.RevisedTIA 2019\RevisedTIA_20 Hofmann Drive, Noosaville.docx Cambray Consulting Pty Ltd | Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.