Original source · versioned page text
F - Traffic Response and Revised Traffic Impact Assessment (17.09.19)
Original PDF page 65, section 1. The text section number identifies this passage in the reader.
BUILDING 2 BUILDING 3
TENANCY 11 ST
500 m²
22 S PH
TAFF
PAR
KING
SPA
CES
TENANCY 12
325m²
TENANCY 13
230m²
5 TENANCY 14
230m²
30
TENANCY 01
2760m²
TENANCY
021 16
118 m²
16
CUS
TOM
ER C
ARP
A RKIN
G
5
11
TENANCY 16
11
11 500m²
11
12.5
4
19
TENANCY 17
5
500m²
CONCEPT DRAWING.
2.4 5.9 1.4
FOR DISCUSSION ONLY .
HRV - Heavy Rigid Vehicle 4
Overall Length 12.500m
Overall Width
TENANCY 20 2.500m
(NLA) 0 5 10 15 20 25m
Overall Body Height 4.300m
Min Body Ground Clearance ground level0.417m
=680m²
Track Width
Lock to Lock Time
2.500m
TENANCY 18 1:500 @A3 (Approx.)
Kerb to Kerb Turning Radius
level one =6.00s
680m²
12.500m Approx.
500m²
level two = 660m²
16
B 17.09.19 RFI Report MG AD PRELIMINARY BLU0517-01
Proposed Retail Business (Type 4) Showroom A 16.05.19 Report MG AD NOT FOR CONSTRUCTION
CAMBRAYconsulting 20 Hofmann Drive SK06
Traffic Engineering and Transport Planning 12.5m Heavy Rigid Vehicle (12.5m HRV) Swept Path
Noosaville, QLD
Suite 2601, 21 Mary Street Brisbane Q 4000 This concept takes into account the instructions and requirements of our client. Cambray has taken care
in preparing this concept, however it neither accepts liability nor responsibility whatsoever in respect 17.09.19 1:500 Blueprint Group Australia Pty Ltd
t : 07 3221 3503 | e : [email protected] of; any use of this document by any third party, any third party whose interests may be affected by any
decision made regarding the contents of this document and/or any conclusion drawn resulting from
omission or lack of full discloser by the client or the client's consultants.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.