F - Traffic Response and Revised Traffic Impact Assessment (17.09.19)
Original PDF page 66, section 1. The text section number identifies this passage in the reader.
CUS
TOM
ER C
ARP
ARK
ING
21 5
11
TENANCY 16
11
11 500m²
11
4
19
TENANCY 17
5
500m²
4
TENANCY 20 (NLA)
ground level =680m²
TENANCY 18
level one = 680m²
500m²
level two = 660m²
16
14
16
5
E5
B3
TENANCY 19
500m²
TENANCY 02
OAD
1800m²
KR
REE
IE C
EEN
12.5
CONCEPT DRAWING.
2.4 5.9 1.4
FOR DISCUSSION ONLY .
HRV - Heavy Rigid Vehicle
Overall Length 12.500m
Overall Width 2.500m 0 5 10 15 20 25m
Overall Body Height 4.300m
Min Body Ground Clearance 0.417m
Track Width
Lock to Lock Time
2.500m
6.00s
1:500 @A3 (Approx.)
Kerb to Kerb Turning Radius 12.500m Approx.
B 17.09.19 RFI Report MG AD PRELIMINARY BLU0517-01
Proposed Retail Business (Type 4) Showroom A 16.05.19 Report MG AD NOT FOR CONSTRUCTION
CAMBRAYconsulting 20 Hofmann Drive SK07
Traffic Engineering and Transport Planning 12.5m Heavy Rigid Vehicle (12.5m HRV) Swept Path
Noosaville, QLD
Suite 2601, 21 Mary Street Brisbane Q 4000 This concept takes into account the instructions and requirements of our client. Cambray has taken care
in preparing this concept, however it neither accepts liability nor responsibility whatsoever in respect 17.09.19 1:500 Blueprint Group Australia Pty Ltd
t : 07 3221 3503 | e : [email protected] of; any use of this document by any third party, any third party whose interests may be affected by any
decision made regarding the contents of this document and/or any conclusion drawn resulting from
omission or lack of full discloser by the client or the client's consultants.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.