Original source · versioned page text
F - Traffic Response and Revised Traffic Impact Assessment (17.09.19)
Original PDF page 67, section 1. The text section number identifies this passage in the reader.
BUILDING 1 BUILDING 2
TENANCY 03 TENANCY 04 05 06 07 08 09 10 TENANCY 11
700 m² 580 m² 150 m² 150 m² 150 m² 150 m² 150 m² 150 m² 500 m²
29
CUSTOMER CARPARKING 5
14 11 9
30
16
TENANCY
022 TENANCY
98 m² 021 16
26
118 m²
16
21 5
11
11
HOFM
ANN
DRIV 19
12.5
E
CONCEPT DRAWING.
2.4 5.9 1.4
FOR DISCUSSION ONLY .
HRV - Heavy Rigid Vehicle TENANCY 20 (NLA)
Overall Length 12.500m ground
Overall Width 2.500m 0 5 10 15 20 level
25m=680m²
Overall Body Height
Min Body Ground Clearance
4.300m
0.417m
level one = 680m²
Track Width
Lock to Lock Time
2.500m
6.00s
1:500 @A3 (Approx.) level two = 660m²
Kerb to Kerb Turning Radius 12.500m Approx.
B 17.09.19 RFI Report MG AD PRELIMINARY BLU0517-01
Proposed Retail Business (Type 4) Showroom A 16.05.19 Report MG AD NOT FOR CONSTRUCTION
CAMBRAYconsulting 20 Hofmann Drive SK08
Traffic Engineering and Transport Planning 12.5m Heavy Rigid Vehicle (12.5m HRV) Swept Path
Noosaville, QLD
Suite 2601, 21 Mary Street Brisbane Q 4000 This concept takes into account the instructions and requirements of our client. Cambray has taken care
in preparing this concept, however it neither accepts liability nor responsibility whatsoever in respect 17.09.19 1:500 Blueprint Group Australia Pty Ltd
t : 07 3221 3503 | e : [email protected] of; any use of this document by any third party, any third party whose interests may be affected by any
decision made regarding the contents of this document and/or any conclusion drawn resulting from
omission or lack of full discloser by the client or the client's consultants.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.