ATTCH 4 - IR Response - UXO vegetation clearance (Opec Systems)

Attached to the e-mail RAL17/0501 IR Response email 2 of 4.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

method of clearing and survey in environmentally sensitive areas across Australia, including the Noosa
National Park.

A Digital/Analog survey will be undertaken over developable areas of the site, namely those areas identified
as “Building Envelope,” “Asset Protection Zone – Driveway,” and “Covenant (Bushfire Risk and Stormwater
Management) Area” identified on the Subdivision Layout Plan (Attachment 1) and the Vegetation
Management Plan – Occupation Phase (refer to John Delaney response). To enable an Digital/Analog survey
all vegetation will need to be reduced to a height of approximately 50mm above ground.

Figure 1 identifies the extent of clearing on the site in accordance with the above discussion. Areas marked
in green will involve minor clearing by hand/brushcutter for the purpose of a visual surface survey. Areas
marked in red will involve de-vegetation for the purpose of Digital/Analog survey. Figure 1 is indicative and is
intended to reflect the Covenant Area’s identified in the Subdivision Layout Plan (Attachment 1), Vegetation
Management Plan – Occupation Phase (refer to John Delaney response) and Vegetation Management Plan –
Construction Phase (refer to John Delaney response).

If there is any significant vegetation on the site which is sensitive to clearing as identified by a Vegetation
Management Plan, Clearing Permit or in consultation with the applicants ecologist (John Delaney – Cardno)
or otherwise, then that vegetation can be marked and excluded from clearing for the purpose of the survey.
It is noted that there may be requirement for a services trench to be excavated within the Environmental
Covenant (Habitat Protection) Area during the construction phase of the sub-division. This is indicatively
shown in the Vegetation Management Plan – Construction Phase by the green hatch (refer to John Delaney
response). If that is the case, then de-vegetation to enable Digital/Analog survey will be required in the area
of that trench. In accordance with the Vegetation Management Plan – Construction Phase the cleared area
would then be rehabilitated after construction of the services.

Figure 1 – Indicative De-vegetation Plan
Log in to download the original file

ATTCH 4 - IR Response - UXO vegetation clearance (Opec Systems).pdf · 811 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.