Original source · versioned page text
ATTCH 4 - IR Response - UXO vegetation clearance (Opec Systems)
Attached to the e-mail RAL17/0501 IR Response email 2 of 4.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
method of clearing and survey in environmentally sensitive areas across Australia, including the Noosa National Park. A Digital/Analog survey will be undertaken over developable areas of the site, namely those areas identified as “Building Envelope,” “Asset Protection Zone – Driveway,” and “Covenant (Bushfire Risk and Stormwater Management) Area” identified on the Subdivision Layout Plan (Attachment 1) and the Vegetation Management Plan – Occupation Phase (refer to John Delaney response). To enable an Digital/Analog survey all vegetation will need to be reduced to a height of approximately 50mm above ground. Figure 1 identifies the extent of clearing on the site in accordance with the above discussion. Areas marked in green will involve minor clearing by hand/brushcutter for the purpose of a visual surface survey. Areas marked in red will involve de-vegetation for the purpose of Digital/Analog survey. Figure 1 is indicative and is intended to reflect the Covenant Area’s identified in the Subdivision Layout Plan (Attachment 1), Vegetation Management Plan – Occupation Phase (refer to John Delaney response) and Vegetation Management Plan – Construction Phase (refer to John Delaney response). If there is any significant vegetation on the site which is sensitive to clearing as identified by a Vegetation Management Plan, Clearing Permit or in consultation with the applicants ecologist (John Delaney – Cardno) or otherwise, then that vegetation can be marked and excluded from clearing for the purpose of the survey. It is noted that there may be requirement for a services trench to be excavated within the Environmental Covenant (Habitat Protection) Area during the construction phase of the sub-division. This is indicatively shown in the Vegetation Management Plan – Construction Phase by the green hatch (refer to John Delaney response). If that is the case, then de-vegetation to enable Digital/Analog survey will be required in the area of that trench. In accordance with the Vegetation Management Plan – Construction Phase the cleared area would then be rehabilitated after construction of the services. Figure 1 – Indicative De-vegetation Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.