Council archive · source document
Town Planning Report · MCU13/0102
setback means the minimum distance from any /ot boundary to a building or structure, excluding eaves, roof overhangs and awnings provided they encroach no more than 600mm into the setback distance. site cover means the proportion of a site covered by all buildings and structures shown as a percentage. For enclosed spaces this includes the area within the outside wall and for unenclosed spaces this includes the area measured along a line 600mm in from the perimeter of the roof. Site cover includes garages and other roofed outbuildings, but does not include landscape structures such as in-ground pools and decks. It is noted that the site cover stated on the Proposal Plans includes the full roof area of the salas without making any allowance for the permitted 600mm intrusion and hence they are overstated. Please note, the Plan of Development notates that all dimensions and areas are approximate only, and are subject to survey and Council approval, as such, the Proposal Plans have been prepared in respect of the most recent Lot Caiculations Plan which accurately represents all lot areas. Further, the Lot Calculation Plan identifies a 1-2m? increase in lot area to lots 84-88, in comparison to the Plan of Development, which is considered negligible in the context of calculating site cover. 2.1 Compliance with Elysium Master Plan (Key Development Requirements) The approved Plan of Development for Elysium Noosa provides key development requirements for a range of uses. The key development requirements table on the approved Plan of Development indicates the general requirements for all Group Housing Development precinct residential lots. The provisions of the Key Development Requirements for Precincts are considered below: Allotment 58 Key Requirements Group Housing Development Precinct Private Open Space Entry Lots 901/902: e No Dwellings or Structures other than depicted in the approval landscape plan are to be erected or otherwise installed on these lots. e Maintenance agreement to be included in all bodies corporate to ensure ongoing maintenance of entrance features. Group Housing Lots 94 & 99: e Dwelling units within lot 94 & 99, adjacent to the entry road, are to be set back a minimum of 6 metres. Compliant No dwellings or Structures are proposed to be erected on lots 901, 902, 94 & 99 as part of this proposal. General General requirements for all group Housing Development Precinct Residential Lots: All buildings shall be screened where practical to prevent the ingress of mosquitoes and smaller biting midges. Compliant Screening requirements to be conditioned. Site Cover The maximum site cover for any lot shall not exceed: e 50% for ground floor; and Compliant The proposal is configured over one (1) storey and comprises a total site cover of 46.7%, less than the prescribed 50% site cover for Page 3 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning ReportRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.