Council archive · source document
181002_25 Kauri St_Cooroy_B_Final · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Planning Report & Engineering Report) - MCU18/0165.
25 Kauri St, Cooroy 360 Civil Consulting Pty Ltd corner of the lot and connects to a sewer reticulation main on Olivine St on the opposite side to the development site. The north-eastern corner of the lot is the high point of the lot and achieving a connection into this sewer would not be achievable without significant fill occurring over the site. It is not proposed to connect into this sewer reticulation main. Achieving a sewer connection to the Olivine St sewer reticulation main would also result in additional fill over the site. The preferred connection for the site is a new sewer connection via an extension of the sewer reticulation main from Agate St to the north-western corner of the development site. This proposed sewer alignment is indicatively shown on 360 Civil Consulting Drawings P01 and P02. The development will be serviced via a new 150mm dia house connection branch from this new 150mm dia sewer reticulation main. A review of Unitywater’s Netserv Plan Planning Assumptions Mapping indicates that the lot has an ultimate development allowance of 30.97EP which is anticipated to be sufficient to service the proposed 17 unit development. An application to Unitywater for the sewer reticulation extension and new house connection branch will be required. 13. Water Connection and Fire Hydrant Location The Dial Before You Dig water infrastructure plan for the development site is contained in Appendix C. There is an existing 300mm dia AC trunk water main located along the Olivine St development frontage. There is also an existing 200mm dia AC water reticulation main along the southern side of Olivine St and an existing 150mm dia water reticulation main along the western side of Kauri St. The development site has an existing water meter located halfway along the Olivine St frontage. This water meter will need to be upgraded to a master meter (by Unitywater) and sub-meters will also be provided for each unit (by the developer). The existing water service crossing may need to be upgraded to accommodate the master meter. All costs associated with the water master meter upgrade and sub-meter installation will be borne by the developer. There are two fire hydrants on Kauri St opposite the development site and two fire hydrants on Olivine St opposite the development site. No new fire hydrants are proposed to be installed external to the site. Internal fire protection requirements will be addressed during the detailed design stage by the building hydraulics designer. 2018068 – Engineering Services Report Page 9 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
181002_25 Kauri St_Cooroy_B_Final.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.