Council archive · source document
181002_25 Kauri St_Cooroy_B_Final · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Planning Report & Engineering Report) - MCU18/0165.
25 Kauri St, Cooroy 360 Civil Consulting Pty Ltd 360 Civil Consulting Drawings P01 to P03 are contained in Appendix E and detail the extent of the required frontage works. 9. Stormwater Management – Quantity and Quality Hydrology and Water Management Consulting (HWMC) have been engaged to complete a Stormwater Management Plan for the development. Please refer to this report for full details of the WBNM modelling undertaken to determine stormwater detention and MUSIC modelling undertaken to determine stormwater bio-retention basin requirements. HWMC have determined that the development site must provide: - 36m2 filter area; and 100m3 on-site detention with 240mm dia outlet orifice. 360 Civil Consulting Drawings P01 to P03 are contained in Appendix E and show the proposed location of the bio-retention basin and the on-site detention. It is proposed that the on-site detention will be split between approximately 50m3 accommodated in the bio- retention / detention basin and the remaining 55.5m3 accommodated in underground detention tanks. The outlet for this stormwater system will be to the existing council stormwater infrastructure on Kauri St, north of the development. The bio-retention basin will have a 900mm weir to allow the overflow of large storm events onto Kauri St. 10. Earthworks The existing low point of the development site is the north-western corner of the lot where the proposed bio-retention / detention basin will be located. In order to achieve a stormwater gravity discharge system to the bio-retention basin some filling of the lot will be required. Preliminary calculations indicate that a balanced cut/fill over the site will not be achieved and that some imported fill will be required. Some retaining along the Kauri St frontage will also be required to accommodate this fill. It is anticipated that retaining will be less than 1m in height. 11. Waste Management The development will be accommodated with a bulk bin storage area and the proposed location is shown on 360 Civil Consulting Drawing No. P01. On-site waste collection will occur with the Waste Collection Vehicle (WCV) accessing via either Olivine St or Kauri St to collect the waste. Due to the internal road layout the WCV will be able to enter and exit the site in a forwards gear and no on-site reversing will be required. 12. Sewer Connection The Dial Before You Dig sewer infrastructure plan for the development site is contained in Appendix C. There is an existing sewer reticulation main that traverses the north-eastern 2018068 – Engineering Services Report Page 8 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
181002_25 Kauri St_Cooroy_B_Final.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.