Original source · versioned page text
Meeting papers
Corporate Plan 2023 - 2028
Signature Projects
• Deliver the Noosa Housing Strategy.
• Develop an overarching Community Strategy to replace the Social Strategy.
• Deliver the Living Well program.
• Implement Master Plans for Cooroy and Noosa District Sports Complexes.
• Review the Transport Strategy and prepare a new Movement Strategy and
Connectivity Strategy including shire-wide parking management.
Key Actions
• Develop and implement updated master and business plans for Council’s major
community facilities: the Noosa Leisure Centre, Noosa Aquatic Centre, The J,
Libraries, Cemeteries and Noosa Community Support.
• Complete community infrastructure audit and needs assessment to determine
current and future needs.
• Complete the feasibility of the potential ReGen Physical and Wellbeing Hub
and commence implementation of outcome.
• Complete Non-Powered Water Sports Feasibility Project.
• Develop plan to guide and increase arts and culture in public spaces.
• Complete investigations of both Cooroy and Noosa Shire Business centre transit hubs.
• Redevelop Noosa Heads Bus interchange as an iconic arrival point to Noosa Heads.
• Accelerate delivery of Cycling and Walking Implementation Plan and Noosa Trails
Implementation Plan.
• Investigate and implement a new revenue system which ensures visitors contribute
to the provision and maintenance of transport facilities and services they utilise.
• Continue to implement the Short Stay letting Local Law to manage the impacts of
short term letting.
Performance Measures
• Increase in the amount of social and affordable housing in Noosa.
• Improve liveability ratings measured through the liveability survey for open spaces,
parks, walking and cycling connections. 44
Page 54 of 78
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.