Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
Lake Design and Management
81 Lake A and Lake B and their environs shall be designed and managed in accordance with the
Lake Design and Management Report by 4Site (dated August 2003) and the associated
supplementary material provided by 4Site on 24 February 2004 and is to be consistent with the
Plan of Development, Drawing No 6994-53M Revision M prepared by Conics and dated 12
September 2008, amended as follows:
81.1 Minimum separation distance from the lake edge to any lot boundary shall be 20m, with
the exception of Lake B (existing lake adjacent lots 166, 167 & 168) where a lesser buffer
will be accepted in accordance with Conditions 2.8.1 to 2.8.9.
81.2 The lake shall be designed and managed to minimise the creation of breeding habitat for
cane toads.
82 The construction and operation of the stone-pitched weir on Lake B shall not adversely affect the
adjacent forested areas (Community 3 and Community 4 as identified in the Flora and Fauna
Assessment).
83 The stone-pitch weir for Lake B shall be included within the Private Open Space area.
84 Discharges from Lake A and Lake B shall be controlled and managed so as not to adversely
affect downstream vegetation or aquatic ecosystems or cause erosion and shall incorporate
appropriate flow spreading and energy dissipation devices.
Tennis Court on fill at south end of site
85 Recreational tennis court C shall be designed and constructed so that the finished level is above
RL 3.1 m and does not impact on the adjacent steep slope or native vegetation. It shall be
limited to the existing cleared and filled area, provided they have Q100 immunity and it is on the
hill edge away from the creek. Access to Tennis Court C shall be limited to one pedestrian
pathway, which is the public pathway.
Tennis court A shall be constructed at RL 2.0m AHD.
86 Access to the tennis court shall be limited to one pedestrian pathway. The pathway across the
steep slope shall be designed to have minimal impact on the vegetation and slope stability.
87 The banks of the filled area shall be landscaped to provide visual screening.
88 Toilet facilities are not permitted for Tennis Court C. Toilet facilities proposed for Tennis Court A
shall be 500mm above the defined Q100 flood level.
Environmental Management Plans
89 Prior to approval for a Development Permit for Operational Works, an Environmental
Management Plan for:
89.1 the Construction Stage, and
89.2 the Operational Stage
89.3 of the project shall be prepared to the reasonable satisfaction of Council.
90 These Environmental Management Plans shall be prepared and implemented to ensure that the
impact of the development on the environment is minimised and that the environmental values of
the site are protected and enhanced. The EMPs are to:
90.1 comply with AS00014, and
90.2 demonstrate a high level of environmental care and responsibility and be consistent with
best practice for developments of this type in similar environments.
Page 13 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.