Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7

of 32

Text shows just the words. Original shows the document exactly as it was published.

                                                                                      2003/220735


Construction Environmental Management Plan
91 The Construction Environmental Management Plan shall generally be in accordance with the
   Construction Management Plan prepared by Tate Professional Engineers, dated August 2003.
   However, it shall incorporate all amendments to the Plan of Development and address all
   relevant Conditions of Approval.
92 The Construction Environmental Management Plan shall also:
   92.1 reference all relevant Council Local Laws and Policies (eg. Trade Waste Policy, Local Law
        10 – Vegetation Management, Draft Koala Management Plan, etc.),
   92.2 reference all relevant Legislation (eg. Nature Conservation Act & Regulations, Queensland
        Heritage Act, etc.),
   92.3 include a specific section on vibration nuisance and management,
   92.4 include a specific section on Trade Waste and recycling waste in accordance with
        Council’s Trade Waste Policy,
   92.5 include a specific section on the storage and handling of hazardous wastes,
   92.6 include a specific section on acid sulphate soil management,
   92.7 include a specific section on lake construction and management, and
   92.8 incorporate the specific requirements of Cultural Heritage Management Plan prepared by
        Davies Heritage Consultants.
93 Environmental Procedure EMP-EPO14 shall include reference to, and be consistent with, the
   Ecological Restoration Plan, the Landscape Master Plan and the Lake Design and Management
   Plan. All of these plans will specify:
   93.1 weed control methods and standards, and
   93.2 plant species to be used.
94 The Construction Environmental Management Plan shall apply to all works and activities
   undertaken on any area of the site.
95 The Construction Environmental Management Plan shall incorporate the requirement for
   monthly environmental compliance monitoring reports and annual audit reports to be submitted
   to Council during the construction stages of the development. The format and content of these
   reports shall be in hard copy and digital form, generally in accordance with the following:
   95.1 include tables of the monitoring results (digital form should be in Excel);
   95.2 include individual charts plotting the results for all parameters required in the monitoring;
   95.3 include a brief written discussion of the results and recommend any necessary actions.
Operational Stage Environmental Management Plan
96 An Operational Stage Environmental Management Plan shall be prepared to give guidance to
   the future Bodies Corporate for the community Group Title areas regarding appropriate
   environmental protection and management for the site.
97 The Operational Stage Environmental Management Plan shall address, inter alia,
   97.1 stormwater and water quality management;
   97.2 sediment and erosion control;
   97.3 management of the lake;
   97.4 management of landscaped areas;
   97.5 management of existing native trees and vegetation in residential areas;
                                                                                      Page 14 of 32

Used in these records

About this file

File size
130 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval [As Published].pdf · 130 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.