Council archive · source document
Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
Construction Environmental Management Plan
91 The Construction Environmental Management Plan shall generally be in accordance with the
Construction Management Plan prepared by Tate Professional Engineers, dated August 2003.
However, it shall incorporate all amendments to the Plan of Development and address all
relevant Conditions of Approval.
92 The Construction Environmental Management Plan shall also:
92.1 reference all relevant Council Local Laws and Policies (eg. Trade Waste Policy, Local Law
10 – Vegetation Management, Draft Koala Management Plan, etc.),
92.2 reference all relevant Legislation (eg. Nature Conservation Act & Regulations, Queensland
Heritage Act, etc.),
92.3 include a specific section on vibration nuisance and management,
92.4 include a specific section on Trade Waste and recycling waste in accordance with
Council’s Trade Waste Policy,
92.5 include a specific section on the storage and handling of hazardous wastes,
92.6 include a specific section on acid sulphate soil management,
92.7 include a specific section on lake construction and management, and
92.8 incorporate the specific requirements of Cultural Heritage Management Plan prepared by
Davies Heritage Consultants.
93 Environmental Procedure EMP-EPO14 shall include reference to, and be consistent with, the
Ecological Restoration Plan, the Landscape Master Plan and the Lake Design and Management
Plan. All of these plans will specify:
93.1 weed control methods and standards, and
93.2 plant species to be used.
94 The Construction Environmental Management Plan shall apply to all works and activities
undertaken on any area of the site.
95 The Construction Environmental Management Plan shall incorporate the requirement for
monthly environmental compliance monitoring reports and annual audit reports to be submitted
to Council during the construction stages of the development. The format and content of these
reports shall be in hard copy and digital form, generally in accordance with the following:
95.1 include tables of the monitoring results (digital form should be in Excel);
95.2 include individual charts plotting the results for all parameters required in the monitoring;
95.3 include a brief written discussion of the results and recommend any necessary actions.
Operational Stage Environmental Management Plan
96 An Operational Stage Environmental Management Plan shall be prepared to give guidance to
the future Bodies Corporate for the community Group Title areas regarding appropriate
environmental protection and management for the site.
97 The Operational Stage Environmental Management Plan shall address, inter alia,
97.1 stormwater and water quality management;
97.2 sediment and erosion control;
97.3 management of the lake;
97.4 management of landscaped areas;
97.5 management of existing native trees and vegetation in residential areas;
Page 14 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.