Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the contribution or trading bank guarantee will be returned.
Acid Sulfate Soils Report
159. The development shall be carried out in accordance with the Acid Sulfate Soils Report
prepared by Soil Surveys Engineering Pty Ltd titled, Acid Sulfate Soils Investigation, Weyba
Ranch and dated July 2003.
Earthworks
160. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the ponding of water on any
adjoining lands or the blockage of, or interference with, any natural watercourses.
This will require the design and construction of drainage pipes within the development site that
cater for drainage within the adjoining sites and in this regard a Development Permit for
Operational Works shall be obtained.
161. Where a change in the levels of the site outside of an existing or proposed road reserve is
approved, the site shall be filled or cut so that each lot drains towards a road frontage unless a
proposed drainage system will collect stormwater from off each lot and discharge the
stormwater to an adequate Council stormwater drainage system.
Such works undertaken on the site shall be carried out in accordance with Section 3.8 of
Council's "Engineering Design Standards" Manual so as not to cause any ponding of water on
any adjoining land, or the blockage of, or interference with any natural watercourses.
162. A registered practicing Geotechnical Engineer shall test the existing ground conditions for
suitability of placing additional fill, prior to such fill being placed.
Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper
to the existing levels prior to the rear boundary of the property. Batters shall be at a maximum
grade of 1:4 unless retained by a wall.
Any existing fill or natural materials on the site or with the extent of approved works external to
the site which do not satisfy the Manager - Land Development's or a Geotechnical Engineer's
requirements shall be removed and replaced with suitable material.
163. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No.
Q8A. A registered practicing Geotechnical Engineer shall supervise all the placement of fill and
shall certify that all lots have been compacted to the required standard.
Any existing fill on the site that does not comply with Council’s requirements shall be removed
at the direction of the Manager - Land Development prior to additional filling works
commencing.
164. Following completion of the filling works and prior to endorsement of the Plan of Survey, the
registered practicing Geotechnical Engineer supervising the works shall submit compaction
tests across the entire filled areas and a site classification report for each lot subject to filling.
The extent of fill and each lot site classification shall be shown on a metes and bounds survey
plan.
165. An appropriate property notation shall be placed on Council's rates records to advise
prospective purchasers of lots that have been filled that special foundations requirements will
apply.
Page 24 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.