Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
156. A registered easement shall be created over all proposed Council sewer mains within private
property. The easements shall generally be parallel to, and centred over, the sewer main and
be equivalent in width to twice the depth of invert level of the sewer at the deepest point within
the allotment (measured from the finished surface) and be no less than 3.0 metres wide.
Where Council sewer mains coincide with internal road reserves, the road reserve is to be
dedicated as a sewerage easement to provide maintenance access.
Should the developer utilise private sewers inside individual allotments (ie not in Common
Property), provision shall be made to facilitate maintenance access. In this regard a width
equivalent to twice the depth to invert level of the private sewer at the deepest point within the
allotment (measured from the finished surface) or a minimum of 2.0 metres shall be provided.
Private easements that would alert all potential owners, shall be created over the maintenance
access areas for all private sewers if used. Maintenance responsibilities and building set-back
requirements for any private sewers shall also be clearly designated in the Body Corporate’s
Community Management Scheme.
In this regard, where private sewers are utilised, plans submitted for Operational Works
approval shall be amended to accurately show the location of the Council easements and
private easements.
In addition to this, the Applicant’s solicitor shall give Council’s solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easements shall be submitted to Council for perusal prior to the
use commencing. Any changes required by Council’s solicitor must be corrected immediately.
157. No building or other structure including fountains, retaining walls, etc. (excluding fences) shall
be constructed or encroach over a Council easement or private sewer access. Any building or
structure within proximity of an easement, private sewer access, or any other public utility’s
underground must have its foundations designed so that no surcharge loads are imposed
upon such underground infrastructure. Foundations must be taken down a minimum of 1
metre below a line of influence measured 1 metre in the direction of the foundation from the
centreline of the closest underground service and along the natural angle of repose of the
foundation soil type(s).
Plans and supporting documents, detailing these proposed foundations shall be designed by a
registered practising Geotechnical Engineer and submitted with the application for a
Development Permit for Material Change of Use for the dwelling houses.
Headworks
158. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate only
of the contribution rates as of September 2003 under the current policies is as follows:
Water Supply $4,076
Sewerage $1,441
TOTAL $5,517 per additional lot
All headworks contributions must be paid prior to endorsement of the Plan of Survey for each
stage.
Page 23 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.