Council archive · source document
Decision Notice - Change to an Existing Approval [As Published] · 132003.220735.7
2003/220735
Management Plans
6. The Developer shall prepare various management plans that relate to the design, construction
and operational phases of the development. These plans are to be prepared by appropriately
qualified persons and shall be lodged for approval in sequence as outlined in condition 7.
7. The plans are to address specific matters detailed in the Conditions of this approval.
7.1 The plans to be approved prior to commencement of work on site are:-
Mosquito, Midge and Cane Toad Management Plan
Fire Management Plan
7.2 The plans to be approved prior to the issue of a Development Permit for Operational
Works are:-
Environmental Management Plans for Construction Stages
Ecological Restoration Plan and Specifications
Landscape Master Plan/Assessment Report
Lake Design and Management Plan
Stormwater and Water Quality Management Plan
Waste Management Plan
Acid Sulphate Soils Management Plan
7.3 The plan to be approved within 3 months of commencement of work on site:-
Environmental Management Plan for Operational Stage
Fees Payable
8. The developer shall pay Council all reasonable costs for the assessment of the management
plans and also the costs associated with ensuring the development complies with the
requirements of this approval. These costs shall be limited to a maximum of $25,000 including
the cost of external consultants should they be required, provided management plans of a
suitable standard are submitted for assessment.
9. The further approvals required to allow development to occur shall be subject to the fees
contained in Council’s Fees and Charges Schedule.
Environmental Covenants
10. An environmental covenant as defined by Part 6, Division 4A of the Land Title Act 1994, shall be
registered in favour of Council on all Community Group titles. The environmental covenants
shall be for the protection of the site’s environmental values. In particular the covenant(s) shall
relate to retention of specific vegetation and maintenance of water quality entering the Weyba
Creek system.
Conservation Parkland
11. The Conservation Parkland shall be dedicated to the Crown at the time of reconfiguration as
park for conservation and environmental protection purposes.
12. The Conservation Parkland shall include all parts of the Site shown as Conservation Parkland on
the Plan of Development, Drawing No 6994-53L Revision L prepared by PMM Group and dated
29 September 2004 and the area required by conditions 2.2 and 2.3.
13. All cleared areas within the Conservation Parkland shall be ecologically restored.
Page 6 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 130 KB (small file)
- File type
No other editions are linked here.