Decision Notice - Change to an Existing Approval - 010.2005.00000353.003 [As Published] · 132005.353.03
2005/353
17. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
user class 1 with a minimum head clearance (headroom) at any point of 2.2m.
Park Contributions
18. A Park contribution of $2,791 towards the acquisition of additional parkland or the
improvement of existing parkland and facilities in the locality shall be paid to the Council prior
to obtaining a Development Permit for Operational Works in accordance with Council’s
Planning Scheme Policy PSP24 Park Requirements. This amount will be subject to variations
in the Price Index, All Groups Brisbane from June 2004 until the date of payment.
Roadworks Contributions
19. A roadworks contribution of $173.00 towards intersection improvements at Belmore Terrace
and Seaview Terrace shall be paid to the Council prior to obtaining a Development Permit for
Operational Works. This amount will be subject to variations in the Price Index, All Groups
Brisbane from June 2004 until the date of payment.
Frontage Works
20. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Belmore Terrace frontage of the site in accordance with Planning Scheme Policy PSP1
Landscaping Guidelines. Grass shall be couch, free of weeds.
21. A new 1.2 metre wide concrete path shall be constructed along the Belmore Terrace frontage
of the site in accordance with Council’s design standards and to an alignment that avoids trees
and any infrastructure. Care shall be taken to protect any significant vegetation or any
underground services.
22. The paths shall be designed and constructed to ensure pedestrian safety using non-slip
materials and to produce an evenly graded surface finish.
23. All redundant vehicular crossings to the site shall be removed and replaced by kerb and
channel, footpath paving and landscaping such as trees and grasses in accordance with
Council’s Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
24. A pathway contribution of $425.00 towards external major pathways, in accordance with
Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the
Council prior to obtaining a Development Permit for Operational Works. This amount will be
subject to variations in the Price Index, All Groups Brisbane from June 2004 until the date of
payment.
Stormwater Drainage
25. All stormwater drainage shall be collected on site and discharged to Council’s existing
drainage structures.
26. The present stormwater drainage proposal as shown on drawing 0403-4, dated 27/04/04 by
Callaghan & Toth is unacceptable and shall be re-designed to pipe all on site stormwater
drainage via Lot 702 on RP 48111 (protected by a private drainage easement) which shall
then be connected to the existing Council drainage system at the intersection of Belmore
Terrace and Stevens Street.
27. Plans shall be prepared by a Registered Professional Civil Engineer of all stormwater drainage
works and submitted to Council prior to obtaining a Development Permit for Operational
Works.
28. The maximum discharge of stormwater drainage allowable to Council’s street drainage system
at any one location is 25 litres/second.
29. All site stormwater drainage shall be by means of a gravity system.
Page 4 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2005.00000353.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 72 KB (small file)
- File type
No other editions are linked here.