2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

“s              enti                                                                 en                           |         |

                 Cooroy Mountain Spring Water CEDA Cooroy Mountain Road, Mt. Cooroy QLD

                                                                                                                                |
                 4) Previous assessment                          4.3  Permeability                                             |
                 The outcomes of the previous assessment         Three separate infiltration tests were used
                    Global Testing are as follows.               to determine that the average permeability
                 by   Global Testing are   ws                    for the chosen disposal site was 0.22m/day
                                         .                       and consequently a design irrigation rate      ,              |
                 4.1  Wastewater loading                         (from AS1547) of 20mm/week was adopted.
                 At the time the report was prepared the                                                                       |
                 predicted wastewater loading was a total        4.4 Irrigation area
                  f 1950)    comprised of:
                 °      Uday   compri  °      .                  Based on the above information Global                          |
                    *   900L/day from the existing 3             Testing recommended that a gypsum
                        bedroom household; and                   treated surface spray irrigated area of                       |
                    *   1050L/day from the extended              683m? would be sufficient to assimilate the
                        ernen sen act Persons @ 50L              wastewater generated.                                         |
                        per   person per day).
                         .                                       In accordance with the required Noosa
                 4.2 Soil types                                  Shire setback distance for properties                          !
                 Soil encountered at the site of the             located with the Lake MacDonald
                 proposed irrigation area was defined as a       catchment the proposed area was to be                         |
                 moist brown silty, sandy clay overlying a       focated near the western lot boundary to
                 moist red/brown silty, sandy clay. No           the south of the access road.                                 |
                 indication of soil structure was given.
                                                                                                                               |
                                                                                                                               |
                                                                                                                               |
                                                                                                                                |
                                                                                                                               |
                                                                                                                               1

                                                                                                                               |

                                                                                                                               |
                                                                                                                               |

                                                                                                                               |.

Bf    de       VR
he
 wk   ‘ae     firs:                                                                                                            :
NU
Laos                                                                                                                           |
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.