2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

|                                                                                           GILBERT+SUTHERLANG,

{                      5S) Effluent treatment                           ASINGS 1247 2000
                                                                        data obtained from Appendix 4.2D of
                       system and land
                             :     .                                    Table 5.1.1 lists the wastewater generating
                       application area                                 activities at the redeveloped site during the
{                     This Conceptual Effluent Treatment and            peak summer period when the facility is                 -
                       Disposal Strategy was conducted using a          fully staffed (48 persons).
f                      combination of new data and data taken
                      from the previous site investigation              Table 5.1.1 Proposed wastewater volumes
                       undertaken by Global Testing in 2007.                         Volume | Number | Volume
[                                                        a                              per      of       of waste-
                      The proposed treatment and application                          person | people      water
j                      methods to be employed on-site are based on                      (L)                (Uday)
                      the following guidelines and authorities:         On-site
[                      « the ‘Queensland Plumbing and                   residence
                        Wastewater Code, 2006'                          Dual flush     27.5
{                      e AS/NZS 1547:2000 ‘On-site Domestic     .       toilet*
                        Wastewater Management’ *                        Hand
                       ° panning Guidelines for Water Supply and               re        ee a
                         ewerage                                      |Kitchen     | ST a8                  240
          ‘            ° Queensland Water Recycling Guidelines,       | Misc. | 10 | 48 | 480 |
|                       2005.                                          Prorat 3.328
                                    .       .           att             *Assumes 11/5.5 dual flush cistern, with 1 full
                       site use, it is proposed that the most                seimes  OX ch washes per Cay.
   .                  effecti     d flexibl   thod of irrigati                      .     .        es
                      treat od wart ewater f or th eite Moen ba         For the on-site residence it is assumed that
[                     via surface sprinkler                             it will be a permanent 5 person household
                                          ,                             connected to a bore water supply (i.e.
|                      In calculating a suitable disposal area for       180L/person/day).
                      the predicted wastewater loadings, the site         .          .      .           _,     .
                       was assigned a conservative permeability of      For the bottling facility and administration
 f                     0.22m/day in accordance with Category 5          block, the above loadings assume a total of
                       soils as detailed in Table 4.2A4 of AS/NZS       50.5L/person/day. This is in line with the
 { ;                   1547:2000. A conservative proposed               loadings for industrial use (SOL per person)
                       irrigation area for the expected effluent        from AS1547:2000.
 [                     loadings was therefore calcujated                           .       i
                       incorporating the recommended design              5.2  Bottling facility wash down
 [                     aTegetOn rate (DIR) of 20 mmiweek for a          in addition to the above tabled wastewater
   -                   category 5 soil from Table 4.2A4 of AS/NZS              ti     diections there i    |     ¢
                       1547 (2000). This is detailed in Section 5.4.    generation projections   there ts a volume o
 {                                                           .          water used on a weekly basis to hose down
 --                                             .                       the internal shed floors. This is performed           ‘
            .          5.1  Wastewater loadings                         once a week using a pressure cleaner to
   :                   The following proposed wastewater                conserve water and expedite the task.
                       loadings are based on interviews with               .       .                   .
 I -                   Cooroy Mountain Spring Water staff and           This water is currently collected in a
                                                                        connected series of concrete drains
 j                                                                      embedded in the shed floor. It is proposed    .
 -               BO                                                     that these will drain to a central
 {               S    —* Standards Australia/Standards New Zealand, 2000, underground sump equipped with a pump
                 Si   ASINZS 1547:2000 On-site domestic wastewater      and float switch to enable the contained
                 ;"   Management.                                       waters to be pumped to the effluent
 L               c     Department of Natural Resources & Mines, 2005,   disposal system as the sump level requires.
                 c    Planning Guidelines for Water Supply and Sewerage.
 |               2    Chapter 5 - Demand/Flow and Projections - Table A. . As  .   h    h           i
   .             a    7 Queensland Government, Environmental Protection    suming that the pressure cleaner uses
         _.      “Agency, 2005, WaterWise Queenstand. Queensland        600L per hour and the wash down takes
 {   os 0,23     =    Water Recycling Guidelines 2005.                   half an hour, it is estimated that the
oats vA, Ree                                                                                              .
4  /           oo
- &     oo      ce                                                                                              5-1
 oe           fa
 ti *   wer     -™
 : \         f oe
 pee
 fs : . . < ms. . *
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.