vee ee               aa

                   vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the
                   footpath without any step or level difference. Should any driveways be constructed to grades that
                   do not comply with AS/NZS 2890.1-2004 and AS 2890.2-2002, Council will require that the
                   driveway be removed and reconstructed to levels that do comply.
              10.  All vehicles shall enter and leave the site in a forward direction.
              Loading Areas
              11.  Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site generally as
                   shown on drawing number SK-01, dated 2 August 2010and shail comply with the requirements of
                   AS 2890.2-2002 where applicable.
              Car Parking
              12.  A sealed car parking area shall be provided on site generally as shown on drawing number SK-01,
                   dated 2 August 2010 and shall comply with the requirements of AS/NZS 2890.1-2004 where
                    applicable.
              13.  A minimum of 25 uncovered carpark spaces shail be provided on site, including 1 clearly defined
                   disabled carpark space.
              14.  All carparking shall be kept, maintained and tine-marked in a condition fit for use.
              Roadworks Contributions
              15.  Accontribution of $5,960 shall be paid to the Council towards the cost of improvements to the major
                    road network of Cooroy, as a result of increase traffic generation caused by the proposed
                    development. The contribution shall be paid to the Council prior to obtaining a Development Permit
                    for Operational Works. This amount will be subject to variations in the Consumer Price Index, All
                    Groups Brisbane from December 2007 until the date of payment.
              16. Acontribution of $160,975 shall be paid to the Council towards the cost of improvements to Cooroy
                    Mountain Road, as a result of increase traffic generation caused by the proposed development. The
                    contribution shall be paid to the Council prior to obtaining a Development Permit for Operational
                    Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane
                    from December 2007 until the date of payment.
              Water Quality
              17.   The applicant shall submit a Water Management Plan for Council approval prior to the issue of any
.                   Operational Works Permit. The Water Management Plan shall be prepared by a suitably qualified
                    Environmental Engineer and certified by a Registered Professional Engineer of Queensland.
                    The Water Management Plan shail detail water quantity and quality requirements of environments
                    receiving runoff from the site. The Water Management Plan shall demonstrate that appropriate
                    treatment measures will be incorporated into the proposed use to ensure the existing water quantity
                    and water quality within environments receiving runoff from all aspects of the proposed use (i.e.
                    including but not limited to effluent, carpark runoff and any by products of industrial use occurring on
                    site) are maintained in accordance with The Noosa Plan and the Environmental Protection (Water)
                    Policy 1997.
              Effluent Disposal
               18.  +,
               18A. The design and construction of the on-site effluent disposal system and disposal area shail be in
                    accordance with the Conceptual Effiuent Treatment and Disposal Strategy prepared by Gilbert and
                    Sutherjiand, dated Seteber goo: subject to the following requirements:
                     ,             _ HouemBbe &                           ,
                    (i)       ongoing monitoring of treatment process and disposal areas shall be undertaken to
                             ensure both are functioning effectively over time. They shall be undertaken generally
                              as follows:                                                       .

    .    Po                                                                                        3 of 8
   " : : . ~       .
    Pos.       Ve,
   . \   * . > \ a .
  we   ~     . “>, “£
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.