Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

~                          Sr. eter ~          _- Te oe
                                                          LL                                                    rr
                             *  Annual monitoring shall be undertaken from the time of commissioning to determine
                                the quality of the wastewater produced from the effluent treatment system;
                             *  Monitoring of the soils, vegetation and groundwater in the application area shall be
                                undertaken every three years to establish that such is not percolating into the
                                groundwater;
                .            *  Sampling and testing shall be in accordance with relevant regulatory requirements and
                                manuals such as those provided by the Environmental Protection Agency, with testing
                                undertaken by an accredited Laboratory;                                  ;
                             *  Continuous monitoring shall be undertaken by the system for any water on the surface
                                of the application area, downslope resurfacing, changing plant growth on or around
                                the application area and any other signs of problems, and addressed through
                                maintenance or servicing.
                ~   (ii)     A reserve disposal area 100% the size of the primary disposal area shall be nominated
                              and located outside required buffer areas. The location shali be provided as part of the
                             detailed design report at the Operational Works application stage.
                   (iit)     A minimum of secondary standard effluent treatment with disinfection to achieve the
                              required microbiological quality (i.e. 200 cfu/100 mL with no sample over 1000
          .                  cfu/100mL) shall be adopted.
                    (iv)      Detailed MEDLI modelling shail be undertaken at the operational Works application stage
                             to confirm the appropriate size for the effluent disposal area to ensure this is equal to
                              plant uptake, soil storage and environmentally acceptable release rates.        .
                    (v)       More information on the source/s and respective volumes of wastewater produced during
                              bottling etc shall be provided in a detailed site-based stormwater management plan
                              (SBSWMP) at the Operational Works application stage, including monitoring of actual
                             wastewater production rates.
                    (vi)      Washing plant, equipment or vehicles shall be undertaken off-site. If on-site washing of
                              any plant or equipment is necessary, all wastewater shall be collected in a sump and
                              disposed of off-site as trade waste by a registered operator.
                    (vii)    Additional monitoring of wastewater discharge at Outflow Point 1 (G & S drawing H
                              J0085.1.7) is to be carried out to demonstrate compliance with the desired SVSWMP
                             water quality objectives in support of an operational Works approval, and on an on-going mrontl,
                              basis to demonstrate continued compliance with SBSWMP water quality objectives. This           \
                              monitoring and assessment of the impact must be carried out compliance with the           _
                              Ecoaccess operational policy “Wastewater Discharge to Queensland Waters”.
                    (viii)    Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan (Open
                              Space-Conservation & Waterway Protection) is to be undertaken in addition to replanting
                             as detailed in Drawing     H J0085.1.2 of the Conceptua!        Site-Based  Stormwater
                              Management Plan.

       .  .     :                                                                                    40f8

Jk     ‘       $
AON
NG               ;
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.