Original source · versioned page text
2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Bn
Environmental Health
25. The developer must provide waste storage and disposal facilities in accordance with Planning
Scheme Policy No 9 “Waste Management Multi-Dwellings and Commercial and Industrial
Premises’, including an external imperviously paved area correctly sized for all refuse and recycling
containers and suitably screened from public places and neighbouring properties. A roofed
waste/bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, or
approved wastewater disposal system via a bucket trap and grease arrestor.
26. The development must allow refuse-loading areas to be located off street. All vehicles associated
with the collection of waste/recyclables, shall enter and leave the site in a forward direction, without _
the need for any unsafe maneuvering.
27. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9
“Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be submitted
for the day-to-day operation of the development and approved by Council's Health Section prior to
issue of development permit for operational works. ,
It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
explaining exactly how to predict waste quantities and design waste areas is available from Council
and the web. The Plan shall include the following information: - ;
° The types of waste that will be generated from the activities approved within the
development. ,
° Estimated volumes or tonnage of both recyclables and waste generated. :
° Methods to be used for deating with garden waste.
° Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
° Description of procedures for getting all waste to the bins; the storage of bins and the
collection of bins by the contractor.
° A description of the design details of waste storage and recycling areas including size,
location, elevation and floor plan, methods of bin washing and system to prevent storm
water getting into sewer via the bin wash.
° A description of types and volume of waste storage containers to be used.
° The waste and recycting storage area shall include the provision of containers for all
waste and recycling materials including putresable matter, non-recycling waste, paper/
« cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing
facilities connected to sewer.
. A detailed description of vehicular access to collect waste. Where collection is off street,
access must allow vehictes to enter and leave the site in a forward direction.
: 28. As no Plumbing Final has been issued through Noosa Council Plumbing Services, all existing
; _ plumbing and drainage, along with Backflow Prevention Devices, are to be assessed to ensure
compliance with current Legislation and Acts.
(4__APPROVED PLANSIDOCUMENTS
The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.
5 ADVISORYNOTES i
The following Advisory Notes are for information purposes only and do not form conditions of approval:
ore. 6 of 8
‘wart trhn é> ¥ ‘ .
i SSS Si
\ Le
Gn _Af
ON em eee en ag = ee oe oe |See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.