Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

.          —      a                   We ee          ae                                 .
                                                                            tp ee                             ee         .
            ————ooOoOoOoOouuqyeeeee
             18B. The Conceptual Effluent Treatment and Disposal Strategy prepared by Gilbert and Sutherland,
                ~ dated October 2009 assumes a combined bottied/bulk water production volume of 24 ML/annum,
                  which produces 7.2 ML/annum of waste water. If the production rate increases over 24 ML/annum,
                  additional settlement ponds, chemical treatment and flocculation is required in addition to those
                  measures specified in the Conceptual Effluent Treatment and Disposal Strategy and condition 18A
                  of this approval. These additional measures are to be achieved through larger (vertical) holding
                  tanks and chemical dosing within the approved development footprint. Erosion & Sediment
                  Control                .
             19.  Any person acting on this permit shall prevent erosion and sediment export from leaving the site.
                  Site contro) measures such as silt fencing, controlled gravel access to the site and controlled
                  disposal of waste, will be necessary.  In this regard plans detailing the methods of controlling
                  erosion and sediment are required to be submitted to the: Council for approval prior to obtaining a
                  Development Permit for Operational Works.
             General
             20.  For the following classes of work associated with development, a Development Permit for
  .           .   Operational Works must be obtained prior to commencement of works relating to that class of work.
                  The application may combine any or all of these classes of work:-
                  °        Access and/or Carparking.
                  °        Roadworks.
                  °        Stormwater Drainage.
                  °         Frontage Works.
                  °         Erosion & Sediment Control
             21.  A suitably qualified Registered Professional Engineer shali prepare engineering drawings and
                  specifications for all engineering works that will become Council infrastructure, which shall be
                  submitted in conjunction with an application for a Development Permit for Operational Works.  in
                  this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
                  submitted in conjunction with any application for Operational Works.
             22.  Digital detailed designs inctuding drawings, calculations, specifications and a schedule of works,
                  shall be submitted with any application for a Development Permit for Operational Works in respect
                  of roadworks and stormwater drainage works. The design shall be in accordance with Council's
                   Planning Scheme Policy PSPOS - Engineering Design Standards - Roads, Drainage and
                  Earthworks.   To avoid conflict with underground pipes or services, all existing and proposed
                  services required by the development shall be shown on the plans.
             23.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
                  submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
                  ADAC are available at www.adac.com.au).
             24.  As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for
                  design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of
                  all services and structures. All of which shall be submitted to Council for checking and for Council's
                   records.
                   The data must fully detail levels for all engineering works including but not limited to drainage
                   structures, finished ground levels and pavement surface levels. The data shall be submitted in the
                  Asset Design and As Constructed (ADAC) digital format.     (Guidelines on the use of ADAC are
                   available at www.adac.com.au).
                  Approval of works shail not be granted until all As Constructed information has been supplied and     :
                  accepted by Council.                                                                                .

                                                                                                  5 0f8

  Mee
   Se”
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 1 to Item 1 - Original Court Approval for Bottling Plant(PDF, 6MB).pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.