Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2018-09-17 General Committee Meeting Notes

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                17 SEPTEMBER 2018


        Waste Storage
        16.   Waste storage and disposal facilities must be provided in accordance with
              Planning Scheme Policy 9, Waste Management.
        17.   All refuse and recycling containers must be suitably screened from neighbouring
              properties.
        ENGINEERING
        Site Access and Driveways
        18.   Approval from the Department of Transport and Main Roads for the final design
              and construction of the site access and driveway works must be submitted in
              writing to Council prior to the commencement of the use.
        Car Parking
        19.   A minimum of 7 car parking spaces must be provided and marked on the site as
              part of the first stage of development. The carparking area must be designed by
              a suitably qualified person and must be constructed with:
              a.    a suitably bound surface that minimises the impacts of dust and noise on
                    the proposed development and the adjoining property;
              b.    dimensions, crossfalls and gradients in accordance with Australian
                    Standards AS/NZS2890.1:2004 and AS/NZS2890.6:2009 for the relevant
                    user class.
        Stormwater Drainage
        20.   Stormwater runoff from the development must be disposed of on-site without
              causing scour or damage to the subject site or any adjoining property.
        Earthworks
        21.   All earthworks and associated batters must be contained entirely within the
              subject site unless written permission from the respective landowner(s) is
              provided to Council. All earthworks must be undertaken in accordance with the
              provisions of Australian Standard AS3798: Guidelines on Earthworks for
              Commercial and Residential Developments.
        Damage to Services and Assets
        22.   Any damage caused to existing services and assets as a result of the
              development works must be repaired at no cost to the asset owner at the
              following times:
              a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                    immediately; or
              b.    where otherwise, upon completion of the works associated with the
                    development.
              Any repair work which proposes to alter the alignment or level of existing services
              and assets must first be referred to the relevant service authority for approval.
B.                  Note the report is provided in accordance with Section 63(5) of the
                    Planning Act 2016.
                                                                                        Carried.




                                                                                    Page 6 of 9
Log in to download the original file

2018-09-17 General Committee Meeting Notes(PDF, 403KB).pdf · 413 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.