9.3 T R EE P R OTECTION
Due to the nature of the site, the erection of standard Tree Protection Fencing will not be
achievable throughout the site as the typical steel mesh panels are not suitable to create the
Exclusion Zones.

Exclusion Zone fencing is to consist of 1m high plastic orange mesh/onion sack style barrier
fencing with star pickets with end caps as support, spaced at 4 – 5m and attached with zip
ties as an alternative to steel mesh panels. Flagging is to be used on areas away from the site
to demarcate 'no go zones', e.g., north-west corner and Noosa Council riverside embankment.

When the access and construction requirements have been established, the exclusion zones
can be positioned for the trees to be retained and the alignment of the TPF can be determined.
The TPF is required to be installed in the presence and under the guidance of Consult Arborist
prior to any construction works commencing on the site and should remain intact until the
completion of all works.

As the entire site is considered a protection zone the TPF will be erected in a non-standard
alignment with additional measures installed. Ground protection is to be installed specific to
requirement and can include scaffold walkways, temporary decks, metal/ply sheets, geo fabric
and additional forest mulch to an increased depth of 200-300mm to spread the load of site
activities and minimise ground disturbance.

Trunk protection, to prevent direct contact with the tree’s trunk and buttress roots can be
installed. This can comprise of Geo fab/20mm thick hessian and wooden battens
strapped/taped to the tree’s trunk with a skirt over the buttress roots.

These protection measures will be established between the contractor and the Project
Arborist.




    Figure 10: Temporary exclusion zone            Figure 11: Example of trunk protection




22_06_13_AIA_Aspect_RACV Noosa Eco_V1                                              Page 20 of 53

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Arboricultural Impact Assessment.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.